IAC Assessment: SJ0002
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0002
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2023
Principal Product Cable assemblies
NAICS 335929 - Other Communication and Energy Wire Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 55,000
Annual Production 500,000 Units
Production Hrs. Annual 4,680
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,817 561,767 kWh $0.23
Electricity Demand $25,284 1,616 kW-months/year $15.65
Natural Gas $6,753 284 MMBtu $23.77
TOTAL ENERGY COSTS $158,854
RECOMMENDED SAVINGS* $104,054 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,431
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$72,623
Cost:
$275,269
$68,798 304,759 $3,825 244 - - $68,798
304,759
kWh
$3,825
244
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,741
Cost:
$652
$1,480 6,538 $261 17 - - $1,480
6,538
kWh
$261
17
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$424
Cost:
$194
$388 1,704 $36 2 - - $388
1,704
kWh
$36
2
kW-months/year
-
-
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,185
Cost:
-
- - - - $1,185 50 -
-
kWh
-
-
kW-months/year
$1,185
50
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,309
Cost:
$22,700
$18,264 80,867 $4,045 258 - - $18,264
80,867
kWh
$4,045
258
kW-months/year
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$5,772
Cost:
-
$5,772 25,317 - - - - $5,772
25,317
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$104,054
Cost:
$298,815
$94,702 419,185 $8,167 521 $1,185 50 $94,702
419,185
kWh
$8,167
521
kW-months/year
$1,185
50
MMBtu
TOTAL IMPLEMENTED Savings:
$31,431
Cost:
$23,546
$25,904 114,426 $4,342 277 $1,185 50 $25,904
114,426
kWh
$4,342
277
kW-months/year
$1,185
50
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas