IAC Assessment: SJ0006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2023
Principal Product Roofing; Pond Liners; Custom Products
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 120,000
Annual Production 9,598,000 Pounds
Production Hrs. Annual 4,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $389,107 2,529,775 kWh $0.15
Electricity Demand $362,519 9,168 kW-months/year $39.54
Electricity Fees $(-316,732) - $ -
Natural Gas $97,675 12,439 MMBtu $7.85
TOTAL ENERGY COSTS $532,569
RECOMMENDED SAVINGS* $165,840 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$132,467
Cost:
$665,395
$119,928 779,718 $12,539 318 - - $119,928
779,718
kWh
$12,539
318
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,014
Cost:
$7,324
$2,147 13,956 $2,867 73 - - $2,147
13,956
kWh
$2,867
73
kW-months/year
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$798
Cost:
$2,977
$798 5,188 - - - - $798
5,188
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,078
Cost:
$7,298
- - - - $1,078 137 -
-
kWh
-
-
kW-months/year
$1,078
137
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,647
Cost:
$23,000
$14,647 95,226 - - - - $14,647
95,226
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,713
Cost:
$4,600
$2,713 17,637 - - - - $2,713
17,637
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$8,791
Cost:
$39,456
- - - - $8,791 1,120 -
-
kWh
-
-
kW-months/year
$8,791
1,120
MMBtu
08: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$332
Cost:
$1,762
- - - - $332 42 -
-
kWh
-
-
kW-months/year
$332
42
MMBtu
TOTAL RECOMMENDED Savings:
$165,840
Cost:
$751,812
$140,233 911,725 $15,406 391 $10,201 1,299 $140,233
911,725
kWh
$15,406
391
kW-months/year
$10,201
1,299
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas