IAC logo
IAC Assessment: SJ0011
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0011
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product metal powder coating
NAICS 332812 - Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 70,000
Annual Production 1,000 Units
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $261,075 974,895 kWh $0.27
Natural Gas $268,792 15,161 MMBtu $17.73
TOTAL ENERGY COSTS $529,867
RECOMMENDED SAVINGS* $280,719 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,389
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$37,495
Cost:
$51,522
$37,495 139,908 - - - - $37,495
139,908
kWh
-
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,700
Cost:
$28,158
$27,700 103,437 - - - - $27,700
103,437
kWh
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$787
Cost:
$622
$787 2,938 - - - - $787
2,938
kWh
-
-
$
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,268
Cost:
$3,475
- - - - $4,268 241 -
-
kWh
-
-
$
$4,268
241
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,528
Cost:
$468
$1,528 5,707 - - - - $1,528
5,707
kWh
-
-
$
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$13
Cost:
$71
$13 48 - - - - $13
48
kWh
-
-
$
-
-
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,389
Cost:
-
- - $1,389 - - - -
-
kWh
$1,389
-
$
-
-
MMBtu
08: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$207,539
Cost:
$726,190
$207,539 774,981 - - - - $207,539
774,981
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$280,719
Cost:
$810,506
$275,062 1,027,019 $1,389 - $4,268 241 $275,062
1,027,019
kWh
$1,389
-
$
$4,268
241
MMBtu
TOTAL IMPLEMENTED Savings:
$1,389
Cost:
-
- - $1,389 - - - -
-
kWh
$1,389
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas