IAC Assessment: SJ0012
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0012
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product build-to-print composite parts
NAICS 335991 - Carbon and Graphite Product Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 32,000
Annual Production 9,999 Units
Production Hrs. Annual 2,000
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,336 957,362 kWh $0.31
Electricity Demand $76,578 4,206 kW-months/year $18.21
Natural Gas $2,461 122 MMBtu $20.17
TOTAL ENERGY COSTS $376,375
RECOMMENDED SAVINGS* $175,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,778
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$26
Cost:
-
$26 82 - - $26
82
kWh
-
-
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,374
Cost:
-
$1,017 3,273 $357 20 $1,017
3,273
kWh
$357
20
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$215
Cost:
-
$215 690 - - $215
690
kWh
-
-
kW-months/year
04: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$151,265
Cost:
$402,860
$142,949 460,264 $8,316 457 $142,949
460,264
kWh
$8,316
457
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,778
Cost:
$22,286
$11,572 37,210 $4,206 231 $11,572
37,210
kWh
$4,206
231
kW-months/year
06: 2.2212 USE MINIMUM SAFE OVEN VENTILATION Savings:
$157
Cost:
$217
$116 373 $41 2 $116
373
kWh
$41
2
kW-months/year
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,511
Cost:
$11,438
$6,511 20,694 - - $6,511
20,694
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$175,326
Cost:
$436,801
$162,406 522,586 $12,920 710 $162,406
522,586
kWh
$12,920
710
kW-months/year
TOTAL IMPLEMENTED Savings:
$15,778
Cost:
$22,286
$11,572 37,210 $4,206 231 $11,572
37,210
kWh
$4,206
231
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand