IAC logo
IAC Assessment: SJ0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Cast ison and steel parts
NAICS 331513 - Steel Foundries (except Investment)
SIC 3325 - Steel Foundries, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 70,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 2,080
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,213 1,584,152 kWh $0.10
Electricity Demand $79,988 22,576 kW-months/year $3.54
Natural Gas $90,375 5,453 MMBtu $16.57
TOTAL ENERGY COSTS $336,576
RECOMMENDED SAVINGS* $39,557 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,066
Cost:
$11,290
$5,914 56,367 $1,152 325 $5,914
56,367
kWh
$1,152
325
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,985
Cost:
$11,774
$2,498 23,804 $487 137 $2,498
23,804
kWh
$487
137
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,691
Cost:
$4,253
$2,527 24,086 $164 46 $2,527
24,086
kWh
$164
46
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,283
Cost:
$4,037
$714 6,808 $569 161 $714
6,808
kWh
$569
161
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,414
Cost:
$69
$1,414 13,475 - - $1,414
13,475
kWh
-
-
kW-months/year
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,365
Cost:
$3,762
$1,142 10,887 $223 63 $1,142
10,887
kWh
$223
63
kW-months/year
07: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$22,753
Cost:
$159,594
$22,753 216,691 - - $22,753
216,691
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$39,557
Cost:
$194,779
$36,962 352,118 $2,595 732 $36,962
352,118
kWh
$2,595
732
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand