Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | San Jose State University |
---|---|
Assessment Year | 2024 |
Principal Product | Wood shavings for ag/pet and industrial wood flour |
NAICS | 321219 - Reconstituted Wood Product Manufacturing |
SIC | 2493 - Reconstituted Wood Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 34 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 38,000 Tons |
Production Hrs. Annual | 7,488 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $387,750 | 2,451,284 | kWh | $0.16 |
Electricity Demand | $238,090 | 5,071 | kW-months/year | $46.95 |
LPG | $21,044 | 659 | MMBtu | $31.96 |
TOTAL ENERGY COSTS | $646,884 | |||
RECOMMENDED SAVINGS* | $174,023 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $140,348 Cost: $663,784 |
$139,104 | 879,392 | $1,244 | 27 | - | - | - | - |
$139,104 879,392 kWh |
$1,244 27 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $23,898 Cost: $9,577 |
$16,195 | 102,382 | $7,703 | 164 | - | - | - | - |
$16,195 102,382 kWh |
$7,703 164 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $156 Cost: $358 |
$106 | 671 | $50 | 1 | - | - | - | - |
$106 671 kWh |
$50 1 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $178 Cost: $770 |
$68 | 432 | $110 | 2 | - | - | - | - |
$68 432 kWh |
$110 2 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,344 Cost: - |
$867 | 5,483 | $477 | 10 | - | - | - | - |
$867 5,483 kWh |
$477 10 kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,851 Cost: - |
$221 | 1,394 | - | - | - | - | $2,630 | 82 |
$221 1,394 kWh |
- - kW-months/year |
- - MMBtu |
$2,630 82 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS |
Savings: $2,380 Cost: - |
- | - | - | - | $(-3,916) | (-197) | $6,296 | 197 |
- - kWh |
- - kW-months/year |
$(-3,916) (-197) MMBtu |
$6,296 197 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT |
Savings: $2,868 Cost: $15,989 |
$(-1,962) | (-12,402) | - | - | - | - | $4,830 | 151 |
$(-1,962) (-12,402) kWh |
- - kW-months/year |
- - MMBtu |
$4,830 151 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $174,023 Cost: $690,478 |
$154,599 | 977,352 | $9,584 | 204 | $(-3,916) | (-197) | $13,756 | 430 | $154,599 977,352 kWh |
$9,584 204 kW-months/year |
$(-3,916) (-197) MMBtu |
$13,756 430 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | LPG | Electricity Usage | Electricity Demand | Natural Gas | LPG |