IAC logo
IAC Assessment: SJ0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Wood shavings for ag/pet and industrial wood flour
NAICS 321219 - Reconstituted Wood Product Manufacturing
SIC 2493 - Reconstituted Wood Products
Sales $10,000,000-$50,000,000
# of Employees 34
Plant Area (Sq.Ft.) 38,000
Annual Production 38,000 Tons
Production Hrs. Annual 7,488
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $387,750 2,451,284 kWh $0.16
Electricity Demand $238,090 5,071 kW-months/year $46.95
LPG $21,044 659 MMBtu $31.96
TOTAL ENERGY COSTS $646,884
RECOMMENDED SAVINGS* $174,023 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$140,348
Cost:
$663,784
$139,104 879,392 $1,244 27 - - - - $139,104
879,392
kWh
$1,244
27
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$23,898
Cost:
$9,577
$16,195 102,382 $7,703 164 - - - - $16,195
102,382
kWh
$7,703
164
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$156
Cost:
$358
$106 671 $50 1 - - - - $106
671
kWh
$50
1
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$178
Cost:
$770
$68 432 $110 2 - - - - $68
432
kWh
$110
2
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,344
Cost:
-
$867 5,483 $477 10 - - - - $867
5,483
kWh
$477
10
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,851
Cost:
-
$221 1,394 - - - - $2,630 82 $221
1,394
kWh
-
-
kW-months/year
-
-
MMBtu
$2,630
82
MMBtu
07: 2.1332 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS Savings:
$2,380
Cost:
-
- - - - $(-3,916) (-197) $6,296 197 -
-
kWh
-
-
kW-months/year
$(-3,916)
(-197)
MMBtu
$6,296
197
MMBtu
08: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$2,868
Cost:
$15,989
$(-1,962) (-12,402) - - - - $4,830 151 $(-1,962)
(-12,402)
kWh
-
-
kW-months/year
-
-
MMBtu
$4,830
151
MMBtu
TOTAL RECOMMENDED Savings:
$174,023
Cost:
$690,478
$154,599 977,352 $9,584 204 $(-3,916) (-197) $13,756 430 $154,599
977,352
kWh
$9,584
204
kW-months/year
$(-3,916)
(-197)
MMBtu
$13,756
430
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas LPG Electricity Usage Electricity Demand Natural Gas LPG