IAC Assessment: SJ0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Machined Components; Weldments
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 52
Plant Area (Sq.Ft.) 60,000
Annual Production 1,000 Units
Production Hrs. Annual 4,420
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $434,466 1,532,665 kWh $0.28
Electricity Demand $76,966 4,126 kW-months/year $18.65
Natural Gas $7,338 294 MMBtu $24.96
TOTAL ENERGY COSTS $518,770
RECOMMENDED SAVINGS* $252,332 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$227,474
Cost:
$847,735
$215,894 761,609 $11,580 621 - - $215,894
761,609
kWh
$11,580
621
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$493
Cost:
$109
$493 1,738 - - - - $493
1,738
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,040
Cost:
-
$3,040 10,726 - - - - $3,040
10,726
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,291
Cost:
$2,078
$930 3,282 $361 19 - - $930
3,282
kWh
$361
19
kW-months/year
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,255
Cost:
$1,308
$1,065 3,757 $190 10 - - $1,065
3,757
kWh
$190
10
kW-months/year
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$4,438
Cost:
-
$4,438 15,656 - - - - $4,438
15,656
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,813
Cost:
$12,216
$9,188 32,412 $625 33 - - $9,188
32,412
kWh
$625
33
kW-months/year
-
-
MMBtu
08: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,528
Cost:
-
- - - - $4,528 181 -
-
kWh
-
-
kW-months/year
$4,528
181
MMBtu
TOTAL RECOMMENDED Savings:
$252,332
Cost:
$863,446
$235,048 829,180 $12,756 683 $4,528 181 $235,048
829,180
kWh
$12,756
683
kW-months/year
$4,528
181
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas