IAC logo
IAC Assessment: SJ0023
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Precious metal plating, Alumina metallization and Brazing
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 22
Plant Area (Sq.Ft.) 15,000
Annual Production 200,000 Units
Production Hrs. Annual 2,340
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,357 467,328 kWh $0.14
Electricity Demand $21,985 2,263 kW-months/year $9.71
Natural Gas $15,185 725 MMBtu $20.94
TOTAL ENERGY COSTS $101,527
RECOMMENDED SAVINGS* $31,262 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$21,134
Cost:
$146,494
$21,134 153,465 - - $21,134
153,465
kWh
-
-
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$848
Cost:
$2,144
$631 4,584 $217 22 $631
4,584
kWh
$217
22
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,478
Cost:
$305
$1,478 10,780 - - $1,478
10,780
kWh
-
-
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,823
Cost:
$2,466
$1,823 13,208 - - $1,823
13,208
kWh
-
-
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,164
Cost:
$1,874
$3,164 22,930 - - $3,164
22,930
kWh
-
-
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,625
Cost:
-
$2,625 19,024 - - $2,625
19,024
kWh
-
-
kW-months/year
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$190
Cost:
$380
$190 1,379 - - $190
1,379
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$31,262
Cost:
$153,663
$31,045 225,370 $217 22 $31,045
225,370
kWh
$217
22
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand