IAC logo
IAC Assessment: SJ0024
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0024
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2024
Principal Product Manufacturing Aerospace, Defense, Semiconductor
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $10,000,000-$50,000,000
# of Employees 31
Plant Area (Sq.Ft.) 19,000
Annual Production 30,000 Units
Production Hrs. Annual 2,600
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $78,995 387,184 kWh $0.20
Electricity Demand $23,543 1,282 kW-months/year $18.36
Natural Gas $17,562 640 MMBtu $27.44
TOTAL ENERGY COSTS $120,100
RECOMMENDED SAVINGS* $60,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$45,462
Cost:
$42,170
$43,180 211,668 $2,282 124 $43,180
211,668
kWh
$2,282
124
kW-months/year
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$3,606
Cost:
$5,559
$1,570 7,695 $2,036 111 $1,570
7,695
kWh
$2,036
111
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$490
Cost:
-
$490 2,404 - - $490
2,404
kWh
-
-
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,182
Cost:
-
$8,182 40,107 - - $8,182
40,107
kWh
-
-
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,292
Cost:
$8,243
$1,029 5,042 $263 14 $1,029
5,042
kWh
$263
14
kW-months/year
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,248
Cost:
-
$1,248 6,118 - - $1,248
6,118
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$60,280
Cost:
$55,972
$55,699 273,034 $4,581 249 $55,699
273,034
kWh
$4,581
249
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand