IAC Assessment: SJ0035
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0035
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2025
Principal Product heat treated and brazed metal parts
NAICS 332811 - Metal Heat Treating
SIC 3398 - Metal Heat Treating
Sales $50,000,000-$100,000,000
# of Employees 26
Plant Area (Sq.Ft.) 18,000
Annual Production 8,000 Units
Production Hrs. Annual 5,559
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $507,617 2,006,070 kWh $0.25
Electricity Demand $273,705 8,459 kW-months/year $32.36
Natural Gas $168,555 8,067 MMBtu $20.89
TOTAL ENERGY COSTS $949,877
RECOMMENDED SAVINGS* $334,023 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$54,597
Cost:
$224,515
$46,350 180,739 $8,247 273 - - - - - - - - $46,350
180,739
kWh
$8,247
273
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,438
Cost:
$13,895
- - - - - - $15,438 739 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$15,438
739
MMBtu
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$98,897
Cost:
$43,475
$89,915 355,390 $8,982 278 - - - - - - - - $89,915
355,390
kWh
$8,982
278
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,611
Cost:
-
$3,029 12,012 $582 18 - - - - - - - - $3,029
12,012
kWh
$582
18
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
05: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$13,285
Cost:
-
$13,285 52,511 - - - - - - - - - - $13,285
52,511
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
06: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$75,310
Cost:
$186,900
- - $85,793 2,651 $20,705 - - - - - $(-31,188) - -
-
kWh
$85,793
2,651
kW-months/year
$20,705
-
$
-
-
MMBtu
-
-
$
$(-31,188)
-
$
07: 4.212 ADOPT IN-HOUSE MATERIAL GENERATION Savings:
$33,751
Cost:
$121,250
$(-26,622) (-105,226) $(-6,569) (-203) - - - - $66,942 - - - $(-26,622)
(-105,226)
kWh
$(-6,569)
(-203)
kW-months/year
-
-
$
-
-
MMBtu
$66,942
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$695
Cost:
$3,014
$549 2,170 $146 5 - - - - - - - - $549
2,170
kWh
$146
5
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
09: 2.8112 COMBINE UTILITY METERS Savings:
$38,439
Cost:
-
- - $33,985 1,496 $4,454 - - - - - - - -
-
kWh
$33,985
1,496
kW-months/year
$4,454
-
$
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$334,023
Cost:
$593,049
$126,506 497,596 $131,166 4,518 $25,159 - $15,438 739 $66,942 - $(-31,188) - $126,506
497,596
kWh
$131,166
4,518
kW-months/year
$25,159
-
$
$15,438
739
MMBtu
$66,942
-
$
$(-31,188)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Ancillary Material Cost One-time Revenue or Avoided Cost