IAC Assessment: SJ0036
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SJ0036
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center San Jose State University
Assessment Year 2025
Principal Product Recycled water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales <$500,000
# of Employees 5
Plant Area (Sq.Ft.) 218,000
Annual Production 182,500 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $237,491 1,493,908 kWh $0.16
Electricity Demand $172,376 3,102 kW-months/year $55.57
Electricity Fees $4,555 - $ -
TOTAL ENERGY COSTS $414,422
RECOMMENDED SAVINGS* $145,394 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$74,641
Cost:
$376,992
$55,711 350,385 $18,930 341 - - - - $55,711
350,385
kWh
$18,930
341
kW-months/year
-
-
$
-
-
$
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$7,434
Cost:
$51,497
- - $7,434 134 - - - - -
-
kWh
$7,434
134
kW-months/year
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,847
Cost:
$12,868
$2,013 12,665 $2,834 51 - - - - $2,013
12,665
kWh
$2,834
51
kW-months/year
-
-
$
-
-
$
04: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$13,688
Cost:
$62,974
- - - - - - $13,688 - -
-
kWh
-
-
kW-months/year
-
-
$
$13,688
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,243
Cost:
-
$5,243 32,978 - - - - - - $5,243
32,978
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$39,541
Cost:
-
- - $23,251 1,123 $16,290 - - - -
-
kWh
$23,251
1,123
kW-months/year
$16,290
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$145,394
Cost:
$504,331
$62,967 396,028 $52,449 1,649 $16,290 - $13,688 - $62,967
396,028
kWh
$52,449
1,649
kW-months/year
$16,290
-
$
$13,688
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes