IAC Assessment: SU0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2001
Principal Product Finishing Products
NAICS n/a
SIC 3328 -
Sales $5,000,000-$10,000,000
# of Employees 115
Plant Area (Sq.Ft.) 100,000
Annual Production 230,000 Pieces
Production Hrs. Annual 2,860
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $19,426 489,532 kWh $0.04
Electricity Demand $14,770 1,676 kW-months/year $8.81
Electricity Fees $6,103 - $ -
Natural Gas $41,331 7,671 MMBtu $5.39
TOTAL ENERGY COSTS $81,630
RECOMMENDED SAVINGS* $169,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $93,509
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material By-product Production
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
01: 2.5194 REDESIGN PROCESS Savings:
$89,000
Cost:
$44,000
- - - - - - - - $89,000 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$89,000
-
$
-
-
$
02: 3.2176 INCREASE USE OF AUTOMATION Savings:
$76,400
Cost:
$90,000
- - - - - - $36,400 - - - $40,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$36,400
-
$
-
-
$
$40,000
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,676
Cost:
$705
- - - - $2,676 437 - - - - - - -
-
kWh
-
-
kW-months/year
$2,676
437
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$890
Cost:
-
$890 22,254 - - - - - - - - - - $890
22,254
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$450
Cost:
-
$450 11,250 - - - - - - - - - - $450
11,250
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$319
Cost:
$115
$319 7,985 - - - - - - - - - - $319
7,985
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$174
Cost:
$60
$132 3,306 $42 5 - - - - - - - - $132
3,306
kWh
$42
5
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$169,909
Cost:
$134,880
$1,791 44,795 $42 5 $2,676 437 $36,400 - $89,000 - $40,000 - $1,791
44,795
kWh
$42
5
kW-months/year
$2,676
437
MMBtu
$36,400
-
$
$89,000
-
$
$40,000
-
$
TOTAL IMPLEMENTED Savings:
$93,509
Cost:
$44,880
$1,791 44,795 $42 5 $2,676 437 - - $89,000 - - - $1,791
44,795
kWh
$42
5
kW-months/year
$2,676
437
MMBtu
-
-
$
$89,000
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material By-product Production Electricity Usage Electricity Demand Natural Gas Personnel Changes Primary Raw Material By-product Production