Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2002 |
Principal Product | surgical needles |
NAICS | n/a |
SIC | 3841 - Surgical And Medical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 74,000 |
Annual Production | 200,000,000 Pieces |
Production Hrs. Annual | 5,880 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $417,209 | 4,038,600 | kWh | $0.10 |
Natural Gas | $59,159 | 7,639 | MMBtu | $7.74 |
TOTAL ENERGY COSTS | $476,368 | |||
RECOMMENDED SAVINGS* | $34,391 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,493 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $9,000 Cost: - |
- | - | - | - | - | - | - | - | $9,000 | - |
- - kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
$9,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $6,245 Cost: - |
$4,988 | 49,875 | $1,257 | 84 | - | - | - | - | - | - |
$4,988 49,875 kWh |
$1,257 84 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $3,526 Cost: $270 |
$3,526 | 35,258 | - | - | - | - | - | - | - | - |
$3,526 35,258 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,696 Cost: $60 |
$2,696 | 26,961 | - | - | - | - | - | - | - | - |
$2,696 26,961 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $2,332 Cost: $107 |
- | - | - | - | - | - | $2,332 | 299 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$2,332 299 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7314 REDUCE VENTILATION AIR |
Savings: $1,494 Cost: $104 |
$1,043 | 10,427 | $403 | 27 | - | - | $48 | 6 | - | - |
$1,043 10,427 kWh |
$403 27 kW-months/year |
- - $ |
$48 6 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $1,836 Cost: $5,750 |
- | - | - | - | $1,836 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,836 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $1,654 Cost: - |
$1,654 | 16,538 | - | - | - | - | - | - | - | - |
$1,654 16,538 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,569 Cost: - |
$1,569 | 15,689 | - | - | - | - | - | - | - | - |
$1,569 15,689 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,249 Cost: $700 |
- | - | - | - | - | - | $1,249 | 160 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$1,249 160 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $928 Cost: $63 |
$928 | 9,281 | - | - | - | - | - | - | - | - |
$928 9,281 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $928 Cost: - |
$645 | 6,450 | $283 | 19 | - | - | - | - | - | - |
$645 6,450 kWh |
$283 19 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $379 Cost: $5 |
- | - | - | - | - | - | $379 | 49 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$379 49 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $219 Cost: - |
$219 | 2,193 | - | - | - | - | - | - | - | - |
$219 2,193 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.7235 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT |
Savings: $196 Cost: $60 |
$196 | 1,956 | - | - | - | - | - | - | - | - |
$196 1,956 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $140 Cost: - |
- | - | - | - | - | - | $140 | 18 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$140 18 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,391 Cost: $7,119 |
$17,464 | 174,628 | $1,943 | 130 | $1,836 | - | $4,148 | 532 | $9,000 | - | $17,464 174,628 kWh |
$1,943 130 kW-months/year |
$1,836 - $ |
$4,148 532 MMBtu |
$9,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,493 Cost: $68 |
$8,434 | 84,337 | $1,540 | 103 | - | - | $519 | 67 | - | - | $8,434 84,337 kWh |
$1,540 103 kW-months/year |
- - $ |
$519 67 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Ancillary Material Cost |