IAC logo
IAC Assessment: SU0147
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0147
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2002
Principal Product Blow Molded Parts
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 91,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,954 2,790,240 kWh $0.07
Electricity Demand $95,554 7,117 kW-months/year $13.43
Electricity Fees $5,437 - $ -
Natural Gas $15,694 1,810 MMBtu $8.67
TOTAL ENERGY COSTS $305,685
RECOMMENDED SAVINGS* $23,771 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,867
Cost:
$39,847
$4,933 73,630 $1,934 144 - - - - $4,933
73,630
kWh
$1,934
144
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,126
Cost:
$7,590
$(-965) (-14,400) $258 (-19) - - $4,833 562 $(-965)
(-14,400)
kWh
$258
(-19)
kW-months/year
-
-
$
$4,833
562
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,432
Cost:
$2,288
- - - - - - $3,432 396 -
-
kWh
-
-
kW-months/year
-
-
$
$3,432
396
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,974
Cost:
$8,850
- - - - $2,974 - - - -
-
kWh
-
-
kW-months/year
$2,974
-
$
-
-
MMBtu
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,193
Cost:
$1,528
$2,193 32,731 - - - - - - $2,193
32,731
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,104
Cost:
$5,675
$2,104 31,409 - - - - - - $2,104
31,409
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,381
Cost:
$437
$1,381 20,613 - - - - - - $1,381
20,613
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$694
Cost:
$196
$315 4,704 $379 28 - - - - $315
4,704
kWh
$379
28
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$23,771
Cost:
$66,411
$9,961 148,687 $2,571 153 $2,974 - $8,265 958 $9,961
148,687
kWh
$2,571
153
kW-months/year
$2,974
-
$
$8,265
958
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas