IAC logo
IAC Assessment: SU0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2003
Principal Product Marine, Industrial Hardware
NAICS 332111 - Iron and Steel Forging
SIC 3429 - Hardware, Nec
Sales $10,000,000-$50,000,000
# of Employees 118
Plant Area (Sq.Ft.) 160,000
Annual Production 0 Units
Production Hrs. Annual 4,420
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $301,347 7,770,110 kWh $0.04
Electricity Demand $214,459 49,718 kW-months/year $4.31
Electricity Fees $38,526 - $ -
Natural Gas $443,968 74,504 MMBtu $5.96
TOTAL ENERGY COSTS $998,300
RECOMMENDED SAVINGS* $269,021 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $251,081
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
01: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$99,450
Cost:
$110,400
- - - - - - - - - - $99,450 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$99,450
-
$
02: 3.5145 RECOVER AND REUSE SPENT ACID BATHS Savings:
$30,138
Cost:
$3,234
- - - - - - - - $9,945 1,913 $20,193 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,945
1,913
gal
$20,193
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,370
Cost:
$17,064
$14,694 206,960 $2,676 621 - - - - - - - - $14,694
206,960
kWh
$2,676
621
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,503
Cost:
$937
$10,503 147,931 - - - - - - - - - - $10,503
147,931
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,177
Cost:
$20,736
- - - - $9,177 - - - - - - - -
-
kWh
-
-
kW-months/year
$9,177
-
$
-
-
MMBtu
-
-
gal
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,763
Cost:
$5,538
- - - - - - $8,763 1,475 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,763
1,475
MMBtu
-
-
gal
-
-
$
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$93,620
Cost:
$94,691
$90,897 1,280,244 $2,723 632 - - - - - - - - $90,897
1,280,244
kWh
$2,723
632
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$269,021
Cost:
$252,600
$116,094 1,635,135 $5,399 1,253 $9,177 - $8,763 1,475 $9,945 1,913 $119,643 - $116,094
1,635,135
kWh
$5,399
1,253
kW-months/year
$9,177
-
$
$8,763
1,475
MMBtu
$9,945
1,913
gal
$119,643
-
$
TOTAL IMPLEMENTED Savings:
$251,081
Cost:
$226,326
$116,094 1,635,135 $5,399 1,253 - - - - $9,945 1,913 $119,643 - $116,094
1,635,135
kWh
$5,399
1,253
kW-months/year
-
-
$
-
-
MMBtu
$9,945
1,913
gal
$119,643
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Personnel Changes