IAC logo
IAC Assessment: SU0166
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0166
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2003
Principal Product transportation parts
NAICS 332912 - Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 241,969
Annual Production 350,000 Pieces
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $235,284 4,842,000 kWh $0.05
Electricity Demand $55,762 9,360 kW-months/year $5.96
TOTAL ENERGY COSTS $291,046
RECOMMENDED SAVINGS* $147,820 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $40,125
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes Water Consumption One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,012
Cost:
$232
$4,255 69,960 $757 127 - - - - - - $4,255
69,960
kWh
$757
127
kW-months/year
-
-
$
-
-
Tgal
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,388
Cost:
$480
$4,430 88,612 $958 161 - - - - - - $4,430
88,612
kWh
$958
161
kW-months/year
-
-
$
-
-
Tgal
-
-
$
03: 4.4250 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$28,125
Cost:
$10,016
- - - - $28,125 - - - - - -
-
kWh
-
-
kW-months/year
$28,125
-
$
-
-
Tgal
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,270
Cost:
$24,797
$20,364 407,280 $3,906 55 - - - - - - $20,364
407,280
kWh
$3,906
55
kW-months/year
-
-
$
-
-
Tgal
-
-
$
05: 4.5220 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$24,000
Cost:
$19,912
- - - - - - - - $24,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
Tgal
$24,000
-
$
06: 2.3322 USE EXISTING DAM TO GENERATE ELECTRICITY Savings:
$49,025
Cost:
$132,000
$39,600 792,000 $9,425 1,584 - - - - - - $39,600
792,000
kWh
$9,425
1,584
kW-months/year
-
-
$
-
-
Tgal
-
-
$
07: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$12,000
Cost:
$68,560
- - - - - - $12,000 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,000
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$147,820
Cost:
$255,997
$68,649 1,357,852 $15,046 1,927 $28,125 - $12,000 - $24,000 - $68,649
1,357,852
kWh
$15,046
1,927
kW-months/year
$28,125
-
$
$12,000
-
Tgal
$24,000
-
$
TOTAL IMPLEMENTED Savings:
$40,125
Cost:
$78,576
- - - - $28,125 - $12,000 - - - -
-
kWh
-
-
kW-months/year
$28,125
-
$
$12,000
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ Tgal $ $
Electricity Usage Electricity Demand Personnel Changes Water Consumption One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Personnel Changes Water Consumption One-time Revenue or Avoided Cost