IAC logo
IAC Assessment: SU0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Furniture
NAICS 337211 - Wood Office Furniture Manufacturing
SIC 2511 - Wood Household Furniture
Sales $10,000,000-$50,000,000
# of Employees 495
Plant Area (Sq.Ft.) 476,898
Annual Production 80,000 Pieces
Production Hrs. Annual 3,950
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $227,875 9,265,260 kWh $0.02
Electricity Demand $379,919 29,001 kW-months/year $13.10
Electricity Fees $27,910 - $ -
TOTAL ENERGY COSTS $635,704
RECOMMENDED SAVINGS* $33,858 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,713
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$8,713
Cost:
-
$2,606 104,231 $6,107 466 - - $2,606
104,231
kWh
$6,107
466
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,485
Cost:
-
$829 33,164 $1,656 126 - - $829
33,164
kWh
$1,656
126
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$715
Cost:
$213
$298 11,925 $417 32 - - $298
11,925
kWh
$417
32
kW-months/year
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,759
Cost:
$950
$463 18,539 $1,296 99 - - $463
18,539
kWh
$1,296
99
kW-months/year
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,041
Cost:
$7,458
- - - - $10,041 - -
-
kWh
-
-
kW-months/year
$10,041
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,145
Cost:
$27,936
$2,882 115,265 $7,263 554 - - $2,882
115,265
kWh
$7,263
554
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$33,858
Cost:
$36,557
$7,078 283,124 $16,739 1,277 $10,041 - $7,078
283,124
kWh
$16,739
1,277
kW-months/year
$10,041
-
$
TOTAL IMPLEMENTED Savings:
$23,713
Cost:
$8,621
$4,196 167,859 $9,476 723 $10,041 - $4,196
167,859
kWh
$9,476
723
kW-months/year
$10,041
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees