Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2004 |
Principal Product | Ductile Iron |
NAICS | 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $5,000,000-$10,000,000 |
# of Employees | 74 |
Plant Area (Sq.Ft.) | 110,000 |
Annual Production | 0 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | PA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $115,315 | 1,921,920 | kWh | $0.06 |
Electricity Demand | $14,729 | 4,294 | kW-months/year | $3.43 |
Natural Gas | $44,718 | 554 | MMBtu | $80.72 |
TOTAL ENERGY COSTS | $174,762 | |||
RECOMMENDED SAVINGS* | $92,923 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $92,923 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,108 Cost: - |
$3,673 | 61,219 | $435 | 127 | - | - | - | - |
$3,673 61,219 kWh |
$435 127 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $58,500 Cost: $16,260 |
- | - | - | - | - | - | $58,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$58,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $85 Cost: $45 |
$64 | 1,060 | $21 | 6 | - | - | - | - |
$64 1,060 kWh |
$21 6 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,102 Cost: $13,384 |
$12,703 | 211,723 | $1,399 | 408 | - | - | - | - |
$12,703 211,723 kWh |
$1,399 408 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $13,639 Cost: $14,240 |
- | - | - | - | $13,639 | 1,688 | - | - |
- - kWh |
- - kW-months/year |
$13,639 1,688 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,489 Cost: $10,360 |
- | - | - | - | $2,489 | 308 | - | - |
- - kWh |
- - kW-months/year |
$2,489 308 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $92,923 Cost: $54,289 |
$16,440 | 274,002 | $1,855 | 541 | $16,128 | 1,996 | $58,500 | - | $16,440 274,002 kWh |
$1,855 541 kW-months/year |
$16,128 1,996 MMBtu |
$58,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $92,923 Cost: $54,289 |
$16,440 | 274,002 | $1,855 | 541 | $16,128 | 1,996 | $58,500 | - | $16,440 274,002 kWh |
$1,855 541 kW-months/year |
$16,128 1,996 MMBtu |
$58,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |