IAC logo
IAC Assessment: SU0174
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0174
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Ductile Iron
NAICS 336310 - Motor Vehicle Gasoline Engine and Engine Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $5,000,000-$10,000,000
# of Employees 74
Plant Area (Sq.Ft.) 110,000
Annual Production 0 Pieces
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,315 1,921,920 kWh $0.06
Electricity Demand $14,729 4,294 kW-months/year $3.43
Natural Gas $44,718 554 MMBtu $80.72
TOTAL ENERGY COSTS $174,762
RECOMMENDED SAVINGS* $92,923 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,923
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,108
Cost:
-
$3,673 61,219 $435 127 - - - - $3,673
61,219
kWh
$435
127
kW-months/year
-
-
MMBtu
-
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$58,500
Cost:
$16,260
- - - - - - $58,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$58,500
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$85
Cost:
$45
$64 1,060 $21 6 - - - - $64
1,060
kWh
$21
6
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,102
Cost:
$13,384
$12,703 211,723 $1,399 408 - - - - $12,703
211,723
kWh
$1,399
408
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$13,639
Cost:
$14,240
- - - - $13,639 1,688 - - -
-
kWh
-
-
kW-months/year
$13,639
1,688
MMBtu
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,489
Cost:
$10,360
- - - - $2,489 308 - - -
-
kWh
-
-
kW-months/year
$2,489
308
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$92,923
Cost:
$54,289
$16,440 274,002 $1,855 541 $16,128 1,996 $58,500 - $16,440
274,002
kWh
$1,855
541
kW-months/year
$16,128
1,996
MMBtu
$58,500
-
$
TOTAL IMPLEMENTED Savings:
$92,923
Cost:
$54,289
$16,440 274,002 $1,855 541 $16,128 1,996 $58,500 - $16,440
274,002
kWh
$1,855
541
kW-months/year
$16,128
1,996
MMBtu
$58,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes