IAC logo
IAC Assessment: SU0178
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Cable Connectors
NAICS 334220 - Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3451 - Screw Machine Products
Sales $5,000,000-$10,000,000
# of Employees 490
Plant Area (Sq.Ft.) 106,000
Annual Production 0 Units
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $499,528 6,598,400 kWh $0.08
Electricity Demand $190,650 13,476 kW-months/year $14.15
Electricity Fees $15,152 - $ -
Natural Gas $68,915 889 MMBtu $77.52
TOTAL ENERGY COSTS $774,245
RECOMMENDED SAVINGS* $65,327 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,118
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$26,400
Cost:
-
- - - - - - $26,400 - -
-
kWh
-
-
kW-months/year
-
-
$
$26,400
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,746
Cost:
$527
$8,834 116,128 $2,912 224 - - - - $8,834
116,128
kWh
$2,912
224
kW-months/year
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$580
Cost:
$214
$417 5,491 $163 12 - - - - $417
5,491
kWh
$163
12
kW-months/year
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,209
Cost:
$20,138
$15,620 205,527 $5,589 395 - - - - $15,620
205,527
kWh
$5,589
395
kW-months/year
-
-
$
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,392
Cost:
$15,432
- - - - $5,392 - - - -
-
kWh
-
-
kW-months/year
$5,392
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$65,327
Cost:
$36,311
$24,871 327,146 $8,664 631 $5,392 - $26,400 - $24,871
327,146
kWh
$8,664
631
kW-months/year
$5,392
-
$
$26,400
-
$
TOTAL IMPLEMENTED Savings:
$44,118
Cost:
$16,173
$9,251 121,619 $3,075 236 $5,392 - $26,400 - $9,251
121,619
kWh
$3,075
236
kW-months/year
$5,392
-
$
$26,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost