IAC logo
IAC Assessment: SU0180
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0180
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product alloy metals
NAICS 331492 - Secondary Smelting, Refining, and Alloying of Nonferrous Metal (except Copper and Aluminum)
SIC 3399 - Primary Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 107
Plant Area (Sq.Ft.) 110,000
Annual Production 975,000 Pounds
Production Hrs. Annual 6,000
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $282,596 5,125,373 kWh $0.06
Electricity Demand $190,896 22,955 kW-months/year $8.32
Natural Gas $31,324 4,325 MMBtu $7.24
TOTAL ENERGY COSTS $504,816
RECOMMENDED SAVINGS* $46,883 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $45,236
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$20,507
Cost:
-
- - - - $20,507 - -
-
kWh
-
-
kW-months/year
$20,507
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$13,590
Cost:
-
$13,590 247,104 - - - - $13,590
247,104
kWh
-
-
kW-months/year
-
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$9,884
Cost:
-
- - $9,884 1,188 - - -
-
kWh
$9,884
1,188
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$964
Cost:
-
$964 17,533 - - - - $964
17,533
kWh
-
-
kW-months/year
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,647
Cost:
$712
$1,647 29,952 - - - - $1,647
29,952
kWh
-
-
kW-months/year
-
-
$
06: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$291
Cost:
$680
$291 5,293 - - - - $291
5,293
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$46,883
Cost:
$1,392
$16,492 299,882 $9,884 1,188 $20,507 - $16,492
299,882
kWh
$9,884
1,188
kW-months/year
$20,507
-
$
TOTAL IMPLEMENTED Savings:
$45,236
Cost:
$680
$14,845 269,930 $9,884 1,188 $20,507 - $14,845
269,930
kWh
$9,884
1,188
kW-months/year
$20,507
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost