Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2004 |
Principal Product | Metal Rings |
NAICS | 331511 - Iron Foundries |
SIC | 3321 - Gray And Ductile Iron Foundries |
Sales | $10,000,000-$50,000,000 |
# of Employees | 67 |
Plant Area (Sq.Ft.) | 166,116 |
Annual Production | 100,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $96,910 | 1,982,836 | kWh | $0.05 |
Electricity Demand | $94,925 | 8,378 | kW-months/year | $11.33 |
Electricity Fees | $1,121 | - | $ | - |
Natural Gas | $370,178 | 71,307 | MMBtu | $5.19 |
TOTAL ENERGY COSTS | $563,134 | |||
RECOMMENDED SAVINGS* | $125,493 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $97,193 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.731 ADVERTISE PRODUCT OR SERVICE |
Savings: $83,900 Cost: - |
- | - | - | - | - | - | $83,900 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$83,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,014 Cost: - |
$2,008 | 41,068 | $1,006 | 89 | - | - | - | - |
$2,008 41,068 kWh |
$1,006 89 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $331 Cost: - |
$331 | 6,780 | - | - | - | - | - | - |
$331 6,780 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,663 Cost: $502 |
$997 | 20,384 | $666 | 59 | - | - | - | - |
$997 20,384 kWh |
$666 59 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,191 Cost: $680 |
$793 | 16,225 | $398 | 35 | - | - | - | - |
$793 16,225 kWh |
$398 35 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $18,502 Cost: $12,517 |
- | - | - | - | $18,502 | 3,565 | - | - |
- - kWh |
- - kW-months/year |
$18,502 3,565 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $483 Cost: $523 |
$336 | 6,864 | $147 | 13 | - | - | - | - |
$336 6,864 kWh |
$147 13 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $11,288 Cost: $16,817 |
- | - | - | - | $11,288 | 2,175 | - | - |
- - kWh |
- - kW-months/year |
$11,288 2,175 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $5,121 Cost: $25,260 |
$3,070 | 62,783 | $2,051 | 181 | - | - | - | - |
$3,070 62,783 kWh |
$2,051 181 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $125,493 Cost: $56,299 |
$7,535 | 154,104 | $4,268 | 377 | $29,790 | 5,740 | $83,900 | - | $7,535 154,104 kWh |
$4,268 377 kW-months/year |
$29,790 5,740 MMBtu |
$83,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $97,193 Cost: $18,020 |
$1,460 | 29,869 | $545 | 48 | $11,288 | 2,175 | $83,900 | - | $1,460 29,869 kWh |
$545 48 kW-months/year |
$11,288 2,175 MMBtu |
$83,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Primary Product | Electricity Usage | Electricity Demand | Natural Gas | Primary Product |