IAC logo
IAC Assessment: SU0184
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0184
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Dairy Products
NAICS 311511 - Fluid Milk Manufacturing
SIC 2026 - Fluid Milk
Sales $50,000,000-$100,000,000
# of Employees 440
Plant Area (Sq.Ft.) 200,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $777,562 12,082,139 kWh $0.06
Electricity Demand $178,455 26,236 kW-months/year $6.80
Natural Gas $272,122 36,447 MMBtu $7.47
TOTAL ENERGY COSTS $1,228,139
RECOMMENDED SAVINGS* $57,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,153
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,982
Cost:
-
$7,602 118,045 $2,380 429 - - $7,602
118,045
kWh
$2,380
429
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,593
Cost:
$1,000
$6,682 103,763 $911 179 - - $6,682
103,763
kWh
$911
179
kW-months/year
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,478
Cost:
$574
$2,458 38,172 $1,020 150 - - $2,458
38,172
kWh
$1,020
150
kW-months/year
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,876
Cost:
$2,584
$7,115 110,476 $1,761 304 - - $7,115
110,476
kWh
$1,761
304
kW-months/year
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,619
Cost:
$2,410
- - - - $5,619 - -
-
kWh
-
-
kW-months/year
$5,619
-
$
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,480
Cost:
$2,000
$2,191 34,024 $289 47 - - $2,191
34,024
kWh
$289
47
kW-months/year
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,570
Cost:
$26,324
$13,598 211,147 $1,972 291 - - $13,598
211,147
kWh
$1,972
291
kW-months/year
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,125
Cost:
$15,744
$3,601 55,910 $524 77 - - $3,601
55,910
kWh
$524
77
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$57,723
Cost:
$50,636
$43,247 671,537 $8,857 1,477 $5,619 - $43,247
671,537
kWh
$8,857
1,477
kW-months/year
$5,619
-
$
TOTAL IMPLEMENTED Savings:
$42,153
Cost:
$24,312
$29,649 460,390 $6,885 1,186 $5,619 - $29,649
460,390
kWh
$6,885
1,186
kW-months/year
$5,619
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees