IAC Assessment: SU0185
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0185
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Molded Plastics
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 84
Plant Area (Sq.Ft.) 66,483
Annual Production 78,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,255 2,738,997 kWh $0.08
Electricity Demand $103,494 8,150 kW-months/year $12.70
Electricity Fees $19,515 - $ -
TOTAL ENERGY COSTS $329,264
RECOMMENDED SAVINGS* $138,319 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,033
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$95,123
Cost:
-
$73,698 921,225 $21,425 1,687 $73,698
921,225
kWh
$21,425
1,687
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$19,053
Cost:
-
$15,639 195,485 $3,414 269 $15,639
195,485
kWh
$3,414
269
kW-months/year
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$345
Cost:
$30
$268 3,354 $77 6 $268
3,354
kWh
$77
6
kW-months/year
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$8,959
Cost:
$92
$7,359 91,993 $1,600 126 $7,359
91,993
kWh
$1,600
126
kW-months/year
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,163
Cost:
$1,069
$5,163 64,532 - - $5,163
64,532
kWh
-
-
kW-months/year
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,676
Cost:
$30,734
$9,173 114,660 $503 40 $9,173
114,660
kWh
$503
40
kW-months/year
TOTAL RECOMMENDED Savings:
$138,319
Cost:
$31,925
$111,300 1,391,249 $27,019 2,128 $111,300
1,391,249
kWh
$27,019
2,128
kW-months/year
TOTAL IMPLEMENTED Savings:
$38,033
Cost:
$30,856
$32,439 405,492 $5,594 441 $32,439
405,492
kWh
$5,594
441
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand