Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Corrugated Containers
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 86
Plant Area (Sq.Ft.) 120,000
Annual Production 32,000 Tons
Production Hrs. Annual 4,160
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $202,420 3,773,455 kWh $0.05
Electricity Demand $115,489 10,928 kW-months/year $10.57
Natural Gas $368,226 51,367 MMBtu $7.17
TOTAL ENERGY COSTS $686,135
RECOMMENDED SAVINGS* $100,919 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,134
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,275
Cost:
-
$3,394 62,845 $1,881 178 - - - - $3,394
62,845
kWh
$1,881
178
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,940
Cost:
-
$693 12,833 $1,247 118 - - - - $693
12,833
kWh
$1,247
118
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,291
Cost:
$378
$2,759 51,093 $1,532 145 - - - - $2,759
51,093
kWh
$1,532
145
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,591
Cost:
$1,175
$2,830 52,416 $761 72 - - - - $2,830
52,416
kWh
$761
72
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$49,312
Cost:
$60,000
- - - - $368,301 51,367 $(-318,989) (-51,367) -
-
kWh
-
-
kW-months/year
$368,301
51,367
MMBtu
$(-318,989)
(-51,367)
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$36,510
Cost:
$45,708
- - - - $36,510 5,092 - - -
-
kWh
-
-
kW-months/year
$36,510
5,092
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$100,919
Cost:
$107,261
$9,676 179,187 $5,421 513 $404,811 56,459 $(-318,989) (-51,367) $9,676
179,187
kWh
$5,421
513
kW-months/year
$404,811
56,459
MMBtu
$(-318,989)
(-51,367)
MMBtu
TOTAL IMPLEMENTED Savings:
$59,134
Cost:
$61,553
$6,282 116,342 $3,540 335 $368,301 51,367 $(-318,989) (-51,367) $6,282
116,342
kWh
$3,540
335
kW-months/year
$368,301
51,367
MMBtu
$(-318,989)
(-51,367)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Fuel Oil #2 Electricity Usage Electricity Demand Natural Gas Fuel Oil #2