IAC Assessment: SU0190
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0190
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Newspaper Publishing
NAICS 511110 - Newspaper Publishers
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 62,080
Annual Production 30,000,000 Pieces
Production Hrs. Annual 5,148
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,786 943,840 kWh $0.05
Electricity Demand $28,927 1,942 kW-months/year $14.90
Natural Gas $14,979 1,735 MMBtu $8.63
TOTAL ENERGY COSTS $87,692
RECOMMENDED SAVINGS* $11,813 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,523
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,548
Cost:
-
$743 16,146 $805 54 - - - - - - $743
16,146
kWh
$805
54
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,782
Cost:
-
- - - - - - - - $3,782 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$3,782
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$205
Cost:
-
$116 2,523 $89 6 - - - - - - $116
2,523
kWh
$89
6
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$891
Cost:
$180
$504 10,965 $387 26 - - - - - - $504
10,965
kWh
$387
26
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$97
Cost:
$108
$52 1,133 $45 3 - - - - - - $52
1,133
kWh
$45
3
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$361
Cost:
$500
$29 630 $15 1 - - $264 - $53 - $29
630
kWh
$15
1
kW-months/year
-
-
MMBtu
$264
-
$
$53
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,329
Cost:
$3,430
$703 15,288 $626 42 - - - - - - $703
15,288
kWh
$626
42
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,600
Cost:
$19,500
- - - - $3,600 417 - - - - -
-
kWh
-
-
kW-months/year
$3,600
417
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$11,813
Cost:
$23,718
$2,147 46,685 $1,967 132 $3,600 417 $264 - $3,835 - $2,147
46,685
kWh
$1,967
132
kW-months/year
$3,600
417
MMBtu
$264
-
$
$3,835
-
$
TOTAL IMPLEMENTED Savings:
$6,523
Cost:
$288
$1,415 30,767 $1,326 89 - - - - $3,782 - $1,415
30,767
kWh
$1,326
89
kW-months/year
-
-
MMBtu
-
-
$
$3,782
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost