IAC Assessment: SU0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Plastic Components
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 28,349
Annual Production 74,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $179,038 2,272,440 kWh $0.08
Electricity Demand $47,143 5,035 kW-months/year $9.36
Natural Gas $4,009 313 MMBtu $12.81
TOTAL ENERGY COSTS $230,190
RECOMMENDED SAVINGS* $12,165 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,043
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$662
Cost:
-
$559 6,986 $103 11 - - $559
6,986
kWh
$103
11
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$734
Cost:
$11
$364 4,044 $122 13 $248 - $364
4,044
kWh
$122
13
kW-months/year
$248
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,623
Cost:
$1,616
$4,734 59,170 $889 95 - - $4,734
59,170
kWh
$889
95
kW-months/year
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,404
Cost:
$868
$2,404 29,317 - - - - $2,404
29,317
kWh
-
-
kW-months/year
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,484
Cost:
$576
$1,250 15,625 $234 25 - - $1,250
15,625
kWh
$234
25
kW-months/year
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$136
Cost:
$154
$29 368 $9 1 $98 - $29
368
kWh
$9
1
kW-months/year
$98
-
$
07: 2.3512 DE-ENERGIZE EXCESS TRANSFORMER CAPACITY Savings:
$1,122
Cost:
$2,975
$1,122 14,963 - - - - $1,122
14,963
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$12,165
Cost:
$6,200
$10,462 130,473 $1,357 145 $346 - $10,462
130,473
kWh
$1,357
145
kW-months/year
$346
-
$
TOTAL IMPLEMENTED Savings:
$11,043
Cost:
$3,225
$9,340 115,510 $1,357 145 $346 - $9,340
115,510
kWh
$1,357
145
kW-months/year
$346
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost