IAC logo
IAC Assessment: SU0198
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0198
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2004
Principal Product Lemon and Lime Juice from Concentrate
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 33
Plant Area (Sq.Ft.) 107,674
Annual Production 2,471,000 Pieces
Production Hrs. Annual 4,972
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $158,126 1,918,600 kWh $0.08
Electricity Demand $60,091 6,413 kW-months/year $9.37
Electricity Fees $432 - $ -
Natural Gas $48,920 5,093 MMBtu $9.61
TOTAL ENERGY COSTS $267,569
RECOMMENDED SAVINGS* $44,881 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,956
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$7,681
Cost:
-
- - - - $7,681 - -
-
kWh
-
-
kW-months/year
$7,681
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,671
Cost:
$133
$4,444 54,195 $1,227 131 - - $4,444
54,195
kWh
$1,227
131
kW-months/year
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,691
Cost:
$736
$2,895 35,301 $796 85 - - $2,895
35,301
kWh
$796
85
kW-months/year
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$925
Cost:
$401
$925 11,282 - - - - $925
11,282
kWh
-
-
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,416
Cost:
$883
$470 5,729 $75 8 $871 - $470
5,729
kWh
$75
8
kW-months/year
$871
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$25,497
Cost:
$15,000
$22,414 273,342 $3,083 329 - - $22,414
273,342
kWh
$3,083
329
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$44,881
Cost:
$17,153
$31,148 379,849 $5,181 553 $8,552 - $31,148
379,849
kWh
$5,181
553
kW-months/year
$8,552
-
$
TOTAL IMPLEMENTED Savings:
$43,956
Cost:
$16,752
$30,223 368,567 $5,181 553 $8,552 - $30,223
368,567
kWh
$5,181
553
kW-months/year
$8,552
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost