IAC Assessment: SU0203
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0203
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2005
Principal Product Commercial and Residential Lawnmowers
NAICS 333111 - Farm Machinery and Equipment Manufacturing
SIC 3523 - Farm Machinery And Equipment
Sales $50,000,000-$100,000,000
# of Employees 323
Plant Area (Sq.Ft.) 135,000
Annual Production 23,000 Pieces
Production Hrs. Annual 6,120
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $186,864 2,394,000 kWh $0.08
Electricity Demand $76,905 5,908 kW-months/year $13.02
Natural Gas $201,164 28,497 MMBtu $7.06
TOTAL ENERGY COSTS $464,933
RECOMMENDED SAVINGS* $34,143 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,601
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,139
Cost:
-
$592 7,588 $547 42 - - - - $592
7,588
kWh
$547
42
kW-months/year
-
-
MMBtu
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$9,582
Cost:
-
- - - - - - $9,582 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$9,582
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,367
Cost:
$366
$1,781 22,828 $586 45 - - - - $1,781
22,828
kWh
$586
45
kW-months/year
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,129
Cost:
$308
$647 8,294 $482 37 - - - - $647
8,294
kWh
$482
37
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,105
Cost:
$960
$717 9,198 $169 13 - - $1,219 - $717
9,198
kWh
$169
13
kW-months/year
-
-
MMBtu
$1,219
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,344
Cost:
$1,090
$1,344 17,228 - - - - - - $1,344
17,228
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$16,477
Cost:
$25,850
$(-70) (-893) $(-91) (-7) $2,238 317 $14,400 - $(-70)
(-893)
kWh
$(-91)
(-7)
kW-months/year
$2,238
317
MMBtu
$14,400
-
$
TOTAL RECOMMENDED Savings:
$34,143
Cost:
$28,574
$5,011 64,243 $1,693 130 $2,238 317 $25,201 - $5,011
64,243
kWh
$1,693
130
kW-months/year
$2,238
317
MMBtu
$25,201
-
$
TOTAL IMPLEMENTED Savings:
$5,601
Cost:
$1,634
$3,145 40,320 $1,237 95 - - $1,219 - $3,145
40,320
kWh
$1,237
95
kW-months/year
-
-
MMBtu
$1,219
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost