Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2005 |
Principal Product | Commercial and Residential Lawnmowers |
NAICS | 333111 - Farm Machinery and Equipment Manufacturing |
SIC | 3523 - Farm Machinery And Equipment |
Sales | $50,000,000-$100,000,000 |
# of Employees | 323 |
Plant Area (Sq.Ft.) | 135,000 |
Annual Production | 23,000 Pieces |
Production Hrs. Annual | 6,120 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $186,864 | 2,394,000 | kWh | $0.08 |
Electricity Demand | $76,905 | 5,908 | kW-months/year | $13.02 |
Natural Gas | $201,164 | 28,497 | MMBtu | $7.06 |
TOTAL ENERGY COSTS | $464,933 | |||
RECOMMENDED SAVINGS* | $34,143 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,601 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,139 Cost: - |
$592 | 7,588 | $547 | 42 | - | - | - | - |
$592 7,588 kWh |
$547 42 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $9,582 Cost: - |
- | - | - | - | - | - | $9,582 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$9,582 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,367 Cost: $366 |
$1,781 | 22,828 | $586 | 45 | - | - | - | - |
$1,781 22,828 kWh |
$586 45 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,129 Cost: $308 |
$647 | 8,294 | $482 | 37 | - | - | - | - |
$647 8,294 kWh |
$482 37 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,105 Cost: $960 |
$717 | 9,198 | $169 | 13 | - | - | $1,219 | - |
$717 9,198 kWh |
$169 13 kW-months/year |
- - MMBtu |
$1,219 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,344 Cost: $1,090 |
$1,344 | 17,228 | - | - | - | - | - | - |
$1,344 17,228 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT |
Savings: $16,477 Cost: $25,850 |
$(-70) | (-893) | $(-91) | (-7) | $2,238 | 317 | $14,400 | - |
$(-70) (-893) kWh |
$(-91) (-7) kW-months/year |
$2,238 317 MMBtu |
$14,400 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,143 Cost: $28,574 |
$5,011 | 64,243 | $1,693 | 130 | $2,238 | 317 | $25,201 | - | $5,011 64,243 kWh |
$1,693 130 kW-months/year |
$2,238 317 MMBtu |
$25,201 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,601 Cost: $1,634 |
$3,145 | 40,320 | $1,237 | 95 | - | - | $1,219 | - | $3,145 40,320 kWh |
$1,237 95 kW-months/year |
- - MMBtu |
$1,219 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |