IAC logo
IAC Assessment: SU0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2006
Principal Product Porcelain Insulators
NAICS 327110 - Pottery, Ceramics, and Plumbing Fixture Manufacturing
SIC 3264 - Porcelain Electrical Supplies
Sales $10,000,000-$50,000,000
# of Employees 116
Plant Area (Sq.Ft.) 350,000
Annual Production 1,200 Tons
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $213,875 3,657,253 kWh $0.06
Electricity Demand $102,063 10,598 kW-months/year $9.63
Electricity Fees $7,563 - $ -
Natural Gas $948,148 116,418 MMBtu $8.14
TOTAL ENERGY COSTS $1,303,649
RECOMMENDED SAVINGS* $71,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $35,527
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$14,635
Cost:
-
- - - - - - - - $14,635 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$14,635
-
$
02: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$12,392
Cost:
-
- - - - - - - - $12,392 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$12,392
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,878
Cost:
-
$5,212 89,856 $1,666 173 - - - - - - $5,212
89,856
kWh
$1,666
173
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,547
Cost:
-
$3,189 54,990 $1,358 141 - - - - - - $3,189
54,990
kWh
$1,358
141
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,930
Cost:
-
$2,755 47,502 $1,175 122 - - - - - - $2,755
47,502
kWh
$1,175
122
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,224
Cost:
-
$2,502 43,130 $722 75 - - - - - - $2,502
43,130
kWh
$722
75
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,893
Cost:
$630
$3,113 53,680 $780 81 - - - - - - $3,113
53,680
kWh
$780
81
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$5,210
Cost:
$1,534
- - - - $5,210 640 - - - - -
-
kWh
-
-
kW-months/year
$5,210
640
MMBtu
-
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,794
Cost:
$563
$1,419 24,460 $375 39 - - - - - - $1,419
24,460
kWh
$375
39
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$238
Cost:
$313
$85 1,454 $19 2 - - $64 - $70 - $85
1,454
kWh
$19
2
kW-months/year
-
-
MMBtu
$64
-
$
$70
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$145
Cost:
$222
$145 2,496 - - - - - - - - $145
2,496
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,544
Cost:
$26,000
- - - - $13,544 1,664 - - - - -
-
kWh
-
-
kW-months/year
$13,544
1,664
MMBtu
-
-
$
-
-
$
13: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$372
Cost:
$845
$305 5,256 $67 7 - - - - - - $305
5,256
kWh
$67
7
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
14: 2.2511 INSULATE BARE EQUIPMENT Savings:
$781
Cost:
$2,198
- - - - $781 96 - - - - -
-
kWh
-
-
kW-months/year
$781
96
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$71,583
Cost:
$32,305
$18,725 322,824 $6,162 640 $19,535 2,400 $64 - $27,097 - $18,725
322,824
kWh
$6,162
640
kW-months/year
$19,535
2,400
MMBtu
$64
-
$
$27,097
-
$
TOTAL IMPLEMENTED Savings:
$35,527
Cost:
$2,164
$13,582 234,168 $4,343 451 $5,210 640 - - $12,392 - $13,582
234,168
kWh
$4,343
451
kW-months/year
$5,210
640
MMBtu
-
-
$
$12,392
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost