IAC logo
IAC Assessment: SU0230
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0230
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2006
Principal Product Heat Transfer Equipment
NAICS 332410 - Power Boiler and Heat Exchanger Manufacturing
SIC 3440 -
Sales $50,000,000-$100,000,000
# of Employees 303
Plant Area (Sq.Ft.) 250,000
Annual Production 4,800 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $424,057 4,880,160 kWh $0.09
Electricity Demand $168,877 12,870 kW-months/year $13.12
Electricity Fees $29,670 - $ -
Natural Gas $301,650 36,166 MMBtu $8.34
TOTAL ENERGY COSTS $924,254
RECOMMENDED SAVINGS* $128,776 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $120,868
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$19,527
Cost:
-
- - - - - - $19,527 - -
-
kWh
-
-
kW-months/year
-
-
$
$19,527
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$7,958
Cost:
-
$5,749 66,082 $2,209 169 - - - - $5,749
66,082
kWh
$2,209
169
kW-months/year
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$6,237
Cost:
-
$4,499 51,714 $1,738 133 - - - - $4,499
51,714
kWh
$1,738
133
kW-months/year
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,565
Cost:
-
$4,023 46,239 $1,542 118 - - - - $4,023
46,239
kWh
$1,542
118
kW-months/year
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,565
Cost:
$1,608
$4,023 46,239 $1,542 118 - - - - $4,023
46,239
kWh
$1,542
118
kW-months/year
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$72,359
Cost:
$27,000
$56,139 645,278 $16,220 1,241 - - - - $56,139
645,278
kWh
$16,220
1,241
kW-months/year
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,657
Cost:
$1,484
$2,834 32,573 $823 63 - - - - $2,834
32,573
kWh
$823
63
kW-months/year
-
-
$
-
-
$
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,115
Cost:
$5,820
$3,246 37,315 $1,869 143 - - - - $3,246
37,315
kWh
$1,869
143
kW-months/year
-
-
$
-
-
$
09: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$444
Cost:
$746
$366 4,205 - - $78 - - - $366
4,205
kWh
-
-
kW-months/year
$78
-
$
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,349
Cost:
$9,623
- - - - $2,349 - - - -
-
kWh
-
-
kW-months/year
$2,349
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$128,776
Cost:
$46,281
$80,879 929,645 $25,943 1,985 $2,427 - $19,527 - $80,879
929,645
kWh
$25,943
1,985
kW-months/year
$2,427
-
$
$19,527
-
$
TOTAL IMPLEMENTED Savings:
$120,868
Cost:
$30,092
$77,267 888,125 $24,074 1,842 - - $19,527 - $77,267
888,125
kWh
$24,074
1,842
kW-months/year
-
-
$
$19,527
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost