IAC logo
IAC Assessment: SU0232
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0232
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2006
Principal Product Electronic Assembly Equipment
NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 411
Plant Area (Sq.Ft.) 248,000
Annual Production 3,744 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $358,097 8,078,400 kWh $0.04
Electricity Demand $132,675 17,171 kW-months/year $7.73
Electricity Fees $1,147 - $ -
Natural Gas $197,189 17,947 MMBtu $10.99
TOTAL ENERGY COSTS $689,108
RECOMMENDED SAVINGS* $44,085 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,708
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,030
Cost:
-
$2,165 49,205 $865 112 - - - - $2,165
49,205
kWh
$865
112
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,876
Cost:
-
$2,166 49,218 $710 92 - - - - $2,166
49,218
kWh
$710
92
kW-months/year
-
-
$
-
-
MMBtu
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,612
Cost:
-
$1,233 28,022 $379 49 - - - - $1,233
28,022
kWh
$379
49
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$890
Cost:
-
$666 15,136 $224 29 - - - - $666
15,136
kWh
$224
29
kW-months/year
-
-
$
-
-
MMBtu
05: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$773
Cost:
-
- - - - $773 - - - -
-
kWh
-
-
kW-months/year
$773
-
$
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,165
Cost:
$225
- - - - - - $1,165 106 -
-
kWh
-
-
kW-months/year
-
-
$
$1,165
106
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,647
Cost:
$583
$1,230 27,955 $417 54 - - - - $1,230
27,955
kWh
$417
54
kW-months/year
-
-
$
-
-
MMBtu
08: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$2,880
Cost:
$1,534
- - - - - - $2,880 262 -
-
kWh
-
-
kW-months/year
-
-
$
$2,880
262
MMBtu
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,307
Cost:
$1,182
$936 21,253 $371 48 - - - - $936
21,253
kWh
$371
48
kW-months/year
-
-
$
-
-
MMBtu
10: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$8,585
Cost:
$9,380
$8,585 195,104 - - - - - - $8,585
195,104
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
11: 2.7314 REDUCE VENTILATION AIR Savings:
$12,512
Cost:
$26,994
$12,249 278,379 $263 34 - - - - $12,249
278,379
kWh
$263
34
kW-months/year
-
-
$
-
-
MMBtu
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,616
Cost:
$11,554
- - - - - - $4,616 420 -
-
kWh
-
-
kW-months/year
-
-
$
$4,616
420
MMBtu
13: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$517
Cost:
$1,545
$416 9,461 $101 13 - - - - $416
9,461
kWh
$101
13
kW-months/year
-
-
$
-
-
MMBtu
14: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$651
Cost:
$2,039
$543 12,361 $108 14 - - - - $543
12,361
kWh
$108
14
kW-months/year
-
-
$
-
-
MMBtu
15: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,024
Cost:
$9,635
- - - - $1,024 - - - -
-
kWh
-
-
kW-months/year
$1,024
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$44,085
Cost:
$64,671
$30,189 686,094 $3,438 445 $1,797 - $8,661 788 $30,189
686,094
kWh
$3,438
445
kW-months/year
$1,797
-
$
$8,661
788
MMBtu
TOTAL IMPLEMENTED Savings:
$13,708
Cost:
$2,117
$7,460 169,536 $2,595 336 $773 - $2,880 262 $7,460
169,536
kWh
$2,595
336
kW-months/year
$773
-
$
$2,880
262
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas