Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2006 |
Principal Product | Injection Molded Plastic |
NAICS | 326160 - Plastics Bottle Manufacturing |
SIC | 3085 - Plastics Bottles |
Sales | $50,000,000-$100,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 106,000 |
Annual Production | 200,000,000 Pieces |
Production Hrs. Annual | 8,064 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $783,559 | 10,406,400 | kWh | $0.08 |
Electricity Demand | $169,340 | 21,904 | kW-months/year | $7.73 |
Electricity Fees | $4,742 | - | $ | - |
Natural Gas | $7,970 | 81,550 | MMBtu | $0.10 |
TOTAL ENERGY COSTS | $965,611 | |||
RECOMMENDED SAVINGS* | $91,677 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $81,411 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,860 Cost: - |
$2,500 | 33,090 | $360 | 120 | - | - | - | - |
$2,500 33,090 kWh |
$360 120 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,416 Cost: $171 |
$2,158 | 28,560 | $258 | 86 | - | - | - | - |
$2,158 28,560 kWh |
$258 86 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $868 Cost: $127 |
$868 | 11,491 | - | - | - | - | - | - |
$868 11,491 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,245 Cost: $713 |
- | - | - | - | $4,245 | 415 | - | - |
- - kWh |
- - kW-months/year |
$4,245 415 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $1,176 Cost: $365 |
- | - | - | - | $1,176 | 115 | - | - |
- - kWh |
- - kW-months/year |
$1,176 115 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $758 Cost: $220 |
$677 | 8,960 | $81 | 27 | - | - | - | - |
$677 8,960 kWh |
$81 27 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM |
Savings: $65,227 Cost: $70,000 |
$65,227 | 819,257 | - | - | - | - | - | - |
$65,227 819,257 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,279 Cost: $2,517 |
$(-264) | (-3,499) | $(-15) | (-5) | $2,558 | 250 | - | - |
$(-264) (-3,499) kWh |
$(-15) (-5) kW-months/year |
$2,558 250 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $656 Cost: $1,314 |
$322 | 4,257 | $18 | 6 | - | - | $316 | - |
$322 4,257 kWh |
$18 6 kW-months/year |
- - MMBtu |
$316 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,858 Cost: $12,200 |
$6,477 | 85,721 | $381 | 127 | - | - | - | - |
$6,477 85,721 kWh |
$381 127 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT |
Savings: $4,046 Cost: $8,856 |
$1,166 | 15,426 | $36 | 12 | $2,844 | 278 | - | - |
$1,166 15,426 kWh |
$36 12 kW-months/year |
$2,844 278 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $288 Cost: $701 |
$288 | 3,811 | - | - | - | - | - | - |
$288 3,811 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $91,677 Cost: $97,184 |
$79,419 | 1,007,074 | $1,119 | 373 | $10,823 | 1,058 | $316 | - | $79,419 1,007,074 kWh |
$1,119 373 kW-months/year |
$10,823 1,058 MMBtu |
$316 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $81,411 Cost: $86,142 |
$72,985 | 921,930 | $447 | 149 | $7,979 | 780 | - | - | $72,985 921,930 kWh |
$447 149 kW-months/year |
$7,979 780 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Ancillary Material Cost |