IAC logo
IAC Assessment: SU0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2006
Principal Product Commercial Laundry Equipment
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3582 - Commercial Laundry Equipment
Sales $10,000,000-$50,000,000
# of Employees 91
Plant Area (Sq.Ft.) 63,600
Annual Production 300 Pieces
Production Hrs. Annual 2,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,162 752,236 kWh $0.10
Electricity Demand $38,632 2,581 kW-months/year $14.97
Electricity Fees $4,346 - $ -
Natural Gas $62,336 5,139 MMBtu $12.13
TOTAL ENERGY COSTS $182,622
RECOMMENDED SAVINGS* $37,718 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,638
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,985
Cost:
-
$817 8,093 $1,168 78 - - - - $817
8,093
kWh
$1,168
78
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$19
Cost:
-
$4 44 $15 1 - - - - $4
44
kWh
$15
1
kW-months/year
-
-
MMBtu
-
-
$
03: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING Savings:
$15,419
Cost:
$4,500
- - - - - - $15,419 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$15,419
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$765
Cost:
$201
$406 4,020 $359 24 - - - - $406
4,020
kWh
$359
24
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$5,054
Cost:
$2,928
$(-330) (-3,266) $(-75) (-5) $5,459 450 - - $(-330)
(-3,266)
kWh
$(-75)
(-5)
kW-months/year
$5,459
450
MMBtu
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$290
Cost:
$239
$290 2,869 - - - - - - $290
2,869
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$602
Cost:
$712
$602 5,957 - - - - - - $602
5,957
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$10,784
Cost:
$19,571
- - - - $10,784 889 - - -
-
kWh
-
-
kW-months/year
$10,784
889
MMBtu
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,800
Cost:
$24,622
$1,707 16,898 $1,093 73 - - - - $1,707
16,898
kWh
$1,093
73
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$37,718
Cost:
$52,773
$3,496 34,615 $2,560 171 $16,243 1,339 $15,419 - $3,496
34,615
kWh
$2,560
171
kW-months/year
$16,243
1,339
MMBtu
$15,419
-
$
TOTAL IMPLEMENTED Savings:
$8,638
Cost:
$27,751
$1,787 17,696 $1,392 93 $5,459 450 - - $1,787
17,696
kWh
$1,392
93
kW-months/year
$5,459
450
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Primary Raw Material Electricity Usage Electricity Demand Natural Gas Primary Raw Material