Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2006 |
Principal Product | Commercial Laundry Equipment |
NAICS | 333318 - Other Commercial and Service Industry Machinery Manufacturing |
SIC | 3582 - Commercial Laundry Equipment |
Sales | $10,000,000-$50,000,000 |
# of Employees | 91 |
Plant Area (Sq.Ft.) | 63,600 |
Annual Production | 300 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $76,162 | 752,236 | kWh | $0.10 |
Electricity Demand | $38,632 | 2,581 | kW-months/year | $14.97 |
Electricity Fees | $4,346 | - | $ | - |
Natural Gas | $62,336 | 5,139 | MMBtu | $12.13 |
TOTAL ENERGY COSTS | $182,622 | |||
RECOMMENDED SAVINGS* | $37,718 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,638 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,985 Cost: - |
$817 | 8,093 | $1,168 | 78 | - | - | - | - |
$817 8,093 kWh |
$1,168 78 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $19 Cost: - |
$4 | 44 | $15 | 1 | - | - | - | - |
$4 44 kWh |
$15 1 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.2121 CONVERT TO ELECTROSTATIC POWDER COATING |
Savings: $15,419 Cost: $4,500 |
- | - | - | - | - | - | $15,419 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$15,419 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $765 Cost: $201 |
$406 | 4,020 | $359 | 24 | - | - | - | - |
$406 4,020 kWh |
$359 24 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $5,054 Cost: $2,928 |
$(-330) | (-3,266) | $(-75) | (-5) | $5,459 | 450 | - | - |
$(-330) (-3,266) kWh |
$(-75) (-5) kW-months/year |
$5,459 450 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $290 Cost: $239 |
$290 | 2,869 | - | - | - | - | - | - |
$290 2,869 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $602 Cost: $712 |
$602 | 5,957 | - | - | - | - | - | - |
$602 5,957 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE |
Savings: $10,784 Cost: $19,571 |
- | - | - | - | $10,784 | 889 | - | - |
- - kWh |
- - kW-months/year |
$10,784 889 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,800 Cost: $24,622 |
$1,707 | 16,898 | $1,093 | 73 | - | - | - | - |
$1,707 16,898 kWh |
$1,093 73 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,718 Cost: $52,773 |
$3,496 | 34,615 | $2,560 | 171 | $16,243 | 1,339 | $15,419 | - | $3,496 34,615 kWh |
$2,560 171 kW-months/year |
$16,243 1,339 MMBtu |
$15,419 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,638 Cost: $27,751 |
$1,787 | 17,696 | $1,392 | 93 | $5,459 | 450 | - | - | $1,787 17,696 kWh |
$1,392 93 kW-months/year |
$5,459 450 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material | Electricity Usage | Electricity Demand | Natural Gas | Primary Raw Material |