Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2006 |
Principal Product | Steel Joist and Decking |
NAICS | 332312 - Fabricated Structural Metal Manufacturing |
SIC | 3441 - Fabricated Structural Metal |
Sales | $100,000,000-$500,000,000 |
# of Employees | 79 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 120,000 Tons |
Production Hrs. Annual | 4,000 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $720,792 | 7,408,800 | kWh | $0.10 |
Electricity Demand | $267,030 | 53,406 | kW-months/year | $5.00 |
Electricity Fees | $2,452 | - | $ | - |
Natural Gas | $540,459 | 50,789 | MMBtu | $10.64 |
TOTAL ENERGY COSTS | $1,530,733 | |||
RECOMMENDED SAVINGS* | $113,548 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $48,632 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $18,077 Cost: - |
- | - | - | - | $18,077 | 1,699 | - | - | - | - |
- - kWh |
- - kW-months/year |
$18,077 1,699 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $8,394 Cost: - |
$7,174 | 73,960 | $1,220 | 244 | - | - | - | - | - | - |
$7,174 73,960 kWh |
$1,220 244 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,730 Cost: - |
$1,435 | 14,790 | $295 | 59 | - | - | - | - | - | - |
$1,435 14,790 kWh |
$295 59 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,147 Cost: - |
$952 | 9,810 | $195 | 39 | - | - | - | - | - | - |
$952 9,810 kWh |
$195 39 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $13,094 Cost: $636 |
$11,194 | 115,400 | $1,900 | 380 | - | - | - | - | - | - |
$11,194 115,400 kWh |
$1,900 380 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,352 Cost: $1,344 |
$6,367 | 65,640 | $985 | 197 | - | - | - | - | - | - |
$6,367 65,640 kWh |
$985 197 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $438 Cost: $732 |
$408 | 4,205 | $30 | 6 | - | - | - | - | - | - |
$408 4,205 kWh |
$30 6 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $186 Cost: $428 |
$186 | 1,915 | - | - | - | - | - | - | - | - |
$186 1,915 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $382 Cost: $912 |
$170 | 1,752 | $10 | 2 | - | - | $32 | - | $170 | - |
$170 1,752 kWh |
$10 2 kW-months/year |
- - MMBtu |
$32 - $ |
$170 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $39,436 Cost: $104,800 |
$34,151 | 352,080 | $5,285 | 1,057 | - | - | - | - | - | - |
$34,151 352,080 kWh |
$5,285 1,057 kW-months/year |
- - MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $23,312 Cost: $73,075 |
- | - | - | - | $23,312 | 2,191 | - | - | - | - |
- - kWh |
- - kW-months/year |
$23,312 2,191 MMBtu |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $113,548 Cost: $181,927 |
$62,037 | 639,552 | $9,920 | 1,984 | $41,389 | 3,890 | $32 | - | $170 | - | $62,037 639,552 kWh |
$9,920 1,984 kW-months/year |
$41,389 3,890 MMBtu |
$32 - $ |
$170 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $48,632 Cost: $3,320 |
$26,043 | 268,477 | $4,310 | 862 | $18,077 | 1,699 | $32 | - | $170 | - | $26,043 268,477 kWh |
$4,310 862 kW-months/year |
$18,077 1,699 MMBtu |
$32 - $ |
$170 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | One-time Revenue or Avoided Cost |