IAC logo
IAC Assessment: SU0246
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0246
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2007
Principal Product Lumber
NAICS 321113 - Sawmills
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 60,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 2,600
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,703 3,449,840 kWh $0.04
Electricity Demand $63,214 12,216 kW-months/year $5.17
Electricity Fees $61,177 - $ -
TOTAL ENERGY COSTS $261,094
RECOMMENDED SAVINGS* $418,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,363
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$4,554
Cost:
-
$2,851 71,292 $1,703 329 - - $2,851
71,292
kWh
$1,703
329
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,404
Cost:
-
$1,743 43,593 $1,661 321 - - $1,743
43,593
kWh
$1,661
321
kW-months/year
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,489
Cost:
-
$1,557 38,922 $932 180 - - $1,557
38,922
kWh
$932
180
kW-months/year
-
-
$
04: 3.1182 MAKE A NEW BY-PRODUCT Savings:
$402,220
Cost:
$41,000
- - - - $402,220 - -
-
kWh
-
-
kW-months/year
$402,220
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,989
Cost:
$42
$1,006 25,155 $983 190 - - $1,006
25,155
kWh
$983
190
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,230
Cost:
$850
$1,397 34,918 $833 161 - - $1,397
34,918
kWh
$833
161
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,697
Cost:
$10,420
$1,060 26,494 $637 123 - - $1,060
26,494
kWh
$637
123
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$418,583
Cost:
$52,312
$9,614 240,374 $6,749 1,304 $402,220 - $9,614
240,374
kWh
$6,749
1,304
kW-months/year
$402,220
-
$
TOTAL IMPLEMENTED Savings:
$16,363
Cost:
$11,312
$9,614 240,374 $6,749 1,304 - - $9,614
240,374
kWh
$6,749
1,304
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost