Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2007 |
Principal Product | Converted Paper |
NAICS | 322220 - Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2671 - Paper Coated & Laminated, Packaging |
Sales | $50,000,000-$100,000,000 |
# of Employees | 189 |
Plant Area (Sq.Ft.) | 195,448 |
Annual Production | 30,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $514,073 | 4,587,977 | kWh | $0.11 |
Electricity Demand | $83,854 | 12,535 | kW-months/year | $6.69 |
Electricity Fees | $38,988 | - | $ | - |
Natural Gas | $922,659 | 69,776 | MMBtu | $13.22 |
Fuel Oil #6 | $126,037 | 13,126 | MMBtu | $9.60 |
TOTAL ENERGY COSTS | $2,020,311 | |||
RECOMMENDED SAVINGS* | $126,248 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $67,082 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,054 Cost: - |
$4,532 | 40,465 | $522 | 78 | - | - | - | - |
$4,532 40,465 kWh |
$522 78 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $2,682 Cost: - |
$2,327 | 20,779 | $355 | 53 | - | - | - | - |
$2,327 20,779 kWh |
$355 53 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $707 Cost: - |
$613 | 5,475 | $94 | 14 | - | - | - | - |
$613 5,475 kWh |
$94 14 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $8,210 Cost: $457 |
- | - | - | - | $8,210 | 621 | - | - |
- - kWh |
- - kW-months/year |
$8,210 621 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,670 Cost: $480 |
$4,188 | 37,396 | $482 | 72 | - | - | - | - |
$4,188 37,396 kWh |
$482 72 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $2,314 Cost: $219 |
- | - | - | - | $2,314 | 175 | - | - |
- - kWh |
- - kW-months/year |
$2,314 175 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $41,420 Cost: $8,140 |
$37,152 | 331,718 | $4,268 | 638 | - | - | - | - |
$37,152 331,718 kWh |
$4,268 638 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $38,999 Cost: $17,176 |
- | - | - | - | $38,999 | 2,950 | - | - |
- - kWh |
- - kW-months/year |
$38,999 2,950 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $14,026 Cost: $5,000 |
- | - | - | - | $14,026 | 1,061 | - | - |
- - kWh |
- - kW-months/year |
$14,026 1,061 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $278 Cost: $130 |
- | - | - | - | $278 | 21 | - | - |
- - kWh |
- - kW-months/year |
$278 21 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $234 Cost: $150 |
$108 | 964 | $7 | 1 | - | - | $119 | - |
$108 964 kWh |
$7 1 kW-months/year |
- - MMBtu |
$119 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,778 Cost: $1,620 |
$1,778 | 15,876 | - | - | - | - | - | - |
$1,778 15,876 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,970 Cost: $2,556 |
- | - | - | - | $1,970 | 149 | - | - |
- - kWh |
- - kW-months/year |
$1,970 149 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,906 Cost: $14,129 |
- | - | - | - | - | - | $3,906 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,906 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $126,248 Cost: $50,057 |
$50,698 | 452,673 | $5,728 | 856 | $65,797 | 4,977 | $4,025 | - | $50,698 452,673 kWh |
$5,728 856 kW-months/year |
$65,797 4,977 MMBtu |
$4,025 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $67,082 Cost: $16,395 |
$43,667 | 389,893 | $5,105 | 763 | $18,310 | 1,385 | - | - | $43,667 389,893 kWh |
$5,105 763 kW-months/year |
$18,310 1,385 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost |