IAC logo
IAC Assessment: SU0256
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0256
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2007
Principal Product Container Paper
NAICS 322121 - Paper (except Newsprint) Mills
SIC 2621 - Paper Mills
Sales $50,000,000-$100,000,000
# of Employees 138
Plant Area (Sq.Ft.) 500,000
Annual Production 220,000 Tons
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,413,867 102,159,935 kWh $0.02
Electricity Demand $1,335,058 156,918 kW-months/year $8.51
Electricity Fees $834,972 - $ -
Natural Gas $171,020 16,395 MMBtu $10.43
TOTAL ENERGY COSTS $5,008,862
RECOMMENDED SAVINGS* $322,617 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $62,726
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,194
Cost:
-
$2,633 12,965 $2,561 301 - - - - $2,633
12,965
kWh
$2,561
301
kW-months/year
-
-
$
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,158
Cost:
-
$631 26,279 $527 62 - - - - $631
26,279
kWh
$527
62
kW-months/year
-
-
$
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$16,749
Cost:
$875
- - - - - - $16,749 - -
-
kWh
-
-
kW-months/year
-
-
$
$16,749
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$11,056
Cost:
$11,106
- - - - - - $11,056 - -
-
kWh
-
-
kW-months/year
-
-
$
$11,056
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,492
Cost:
$335
$2,352 98,012 $1,140 134 - - - - $2,352
98,012
kWh
$1,140
134
kW-months/year
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,792
Cost:
$1,750
$1,882 78,402 $910 107 - - - - $1,882
78,402
kWh
$910
107
kW-months/year
-
-
$
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,382
Cost:
$13,420
$11,872 494,662 $510 60 - - - - $11,872
494,662
kWh
$510
60
kW-months/year
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$137
Cost:
$388
$32 1,314 $17 2 - - $88 - $32
1,314
kWh
$17
2
kW-months/year
-
-
$
$88
-
$
09: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$243,880
Cost:
$767,215
- - - - - - $243,880 - -
-
kWh
-
-
kW-months/year
-
-
$
$243,880
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$25,777
Cost:
$83,985
- - - - $25,777 - - - -
-
kWh
-
-
kW-months/year
$25,777
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$322,617
Cost:
$879,074
$19,402 711,634 $5,665 666 $25,777 - $271,773 - $19,402
711,634
kWh
$5,665
666
kW-months/year
$25,777
-
$
$271,773
-
$
TOTAL IMPLEMENTED Savings:
$62,726
Cost:
$97,716
$5,146 117,646 $3,998 470 $25,777 - $27,805 - $5,146
117,646
kWh
$3,998
470
kW-months/year
$25,777
-
$
$27,805
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees One-time Revenue or Avoided Cost