IAC logo
IAC Assessment: SU0262
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0262
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2008
Principal Product Sausage
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 32,000
Annual Production 6,300,000 Pounds
Production Hrs. Annual 3,120
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $86,175 924,300 kWh $0.09
Electricity Demand $41,713 2,439 kW-months/year $17.10
Electricity Fees $8,319 - $ -
Natural Gas $33,789 2,800 MMBtu $12.07
TOTAL ENERGY COSTS $169,996
RECOMMENDED SAVINGS* $23,088 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,311
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$5,029
Cost:
-
- - - - - - $5,029 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,029
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,309
Cost:
-
- - - - - - $4,309 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,309
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,352
Cost:
-
- - - - - - $1,352 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,352
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,275
Cost:
$392
$745 8,018 $530 31 - - - - $745
8,018
kWh
$530
31
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,882
Cost:
$5,215
$2,864 30,794 $2,018 118 - - - - $2,864
30,794
kWh
$2,018
118
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$338
Cost:
$577
- - - - $338 28 - - -
-
kWh
-
-
kW-months/year
$338
28
MMBtu
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$183
Cost:
$308
$183 1,971 - - - - - - $183
1,971
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,400
Cost:
$10,328
$3,171 34,098 $2,229 130 - - - - $3,171
34,098
kWh
$2,229
130
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$320
Cost:
$716
$320 3,441 - - - - - - $320
3,441
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$23,088
Cost:
$17,536
$7,283 78,322 $4,777 279 $338 28 $10,690 - $7,283
78,322
kWh
$4,777
279
kW-months/year
$338
28
MMBtu
$10,690
-
$
TOTAL IMPLEMENTED Savings:
$15,311
Cost:
$15,543
$6,035 64,892 $4,247 248 - - $5,029 - $6,035
64,892
kWh
$4,247
248
kW-months/year
-
-
MMBtu
$5,029
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost