IAC logo
IAC Assessment: SU0268
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0268
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2008
Principal Product Blades for aerospace and power generation
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 297
Plant Area (Sq.Ft.) 240,000
Annual Production 20,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,318,351 18,574,451 kWh $0.07
Electricity Demand $214,526 33,046 kW-months/year $6.49
Electricity Fees $60,488 - $ -
Natural Gas $285,670 28,771 MMBtu $9.93
TOTAL ENERGY COSTS $1,879,035
RECOMMENDED SAVINGS* $97,837 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,731
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,465
Cost:
-
$13,259 176,779 $2,206 340 - - - - - - $13,259
176,779
kWh
$2,206
340
kW-months/year
-
-
$
-
-
$
-
-
$
02: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$854
Cost:
-
- - - - - - $854 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$854
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$22,823
Cost:
$1,071
$19,572 260,957 $3,251 502 - - - - - - $19,572
260,957
kWh
$3,251
502
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,511
Cost:
$1,250
$5,583 74,443 $928 143 - - - - - - $5,583
74,443
kWh
$928
143
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$310
Cost:
$385
$177 2,365 $19 3 - - - - $114 - $177
2,365
kWh
$19
3
kW-months/year
-
-
$
-
-
$
$114
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$39,769
Cost:
$83,044
$34,097 454,460 $5,672 874 - - - - - - $34,097
454,460
kWh
$5,672
874
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$781
Cost:
$1,451
$781 10,408 - - - - - - - - $781
10,408
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$318
Cost:
$674
$318 4,243 - - - - - - - - $318
4,243
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,006
Cost:
$39,533
- - - - $11,006 - - - - - -
-
kWh
-
-
kW-months/year
$11,006
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$97,837
Cost:
$127,408
$73,787 983,655 $12,076 1,862 $11,006 - $854 - $114 - $73,787
983,655
kWh
$12,076
1,862
kW-months/year
$11,006
-
$
$854
-
$
$114
-
$
TOTAL IMPLEMENTED Savings:
$69,731
Cost:
$86,424
$59,747 796,468 $9,870 1,522 - - - - $114 - $59,747
796,468
kWh
$9,870
1,522
kW-months/year
-
-
$
-
-
$
$114
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost