IAC logo
IAC Assessment: SU0274
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0274
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2009
Principal Product Point of Sale Hardware
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3578 - Calculating And Accounting Equipment
Sales $100,000,000-$500,000,000
# of Employees 370
Plant Area (Sq.Ft.) 208,700
Annual Production 20,233 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $257,700 2,814,487 kWh $0.09
Electricity Demand $130,034 8,586 kW-months/year $15.14
Electricity Fees $4,919 - $ -
Natural Gas $11,120 1,000 MMBtu $11.12
TOTAL ENERGY COSTS $403,773
RECOMMENDED SAVINGS* $32,266 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,897
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,264
Cost:
-
- - - - - - - - $11,264 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$11,264
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,328
Cost:
-
- - - - - - - - $2,328 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$2,328
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$545
Cost:
-
$257 2,789 $288 19 - - - - - - $257
2,789
kWh
$288
19
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$498
Cost:
-
$44 482 $454 30 - - - - - - $44
482
kWh
$454
30
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,346
Cost:
$400
$120 1,308 $1,226 81 - - - - - - $120
1,308
kWh
$1,226
81
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$316
Cost:
$204
$28 304 $288 19 - - - - - - $28
304
kWh
$288
19
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$341
Cost:
$268
$185 2,015 $45 3 - - $20 - $91 - $185
2,015
kWh
$45
3
kW-months/year
-
-
$
$20
-
$
$91
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$534
Cost:
$595
$534 5,802 - - - - - - - - $534
5,802
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,444
Cost:
$21,840
$11,173 121,446 $2,271 150 - - - - - - $11,173
121,446
kWh
$2,271
150
kW-months/year
-
-
$
-
-
$
-
-
$
10: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$458
Cost:
$720
$458 4,976 - - - - - - - - $458
4,976
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,192
Cost:
$7,749
- - - - $1,192 - - - - - -
-
kWh
-
-
kW-months/year
$1,192
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$32,266
Cost:
$31,776
$12,799 139,122 $4,572 302 $1,192 - $20 - $13,683 - $12,799
139,122
kWh
$4,572
302
kW-months/year
$1,192
-
$
$20
-
$
$13,683
-
$
TOTAL IMPLEMENTED Savings:
$3,897
Cost:
$8,353
$449 4,883 $2,256 149 $1,192 - - - - - $449
4,883
kWh
$2,256
149
kW-months/year
$1,192
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes