IAC Assessment: SU0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2009
Principal Product Metal Finishing
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales <$500,000
# of Employees 200
Plant Area (Sq.Ft.) 90,316
Annual Production 18,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $289,504 4,717,579 kWh $0.06
Electricity Demand $175,022 10,686 kW-months/year $16.38
Electricity Fees $95,725 - $ -
Natural Gas $613,760 67,422 MMBtu $9.10
TOTAL ENERGY COSTS $1,174,011
RECOMMENDED SAVINGS* $37,131 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,002
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,108
Cost:
-
$1,256 20,596 $852 52 - - - - - - $1,256
20,596
kWh
$852
52
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,063
Cost:
-
$1,359 22,278 $704 43 - - - - - - $1,359
22,278
kWh
$704
43
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,749
Cost:
$1,300
$5,112 83,803 $2,637 161 - - - - - - $5,112
83,803
kWh
$2,637
161
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,458
Cost:
$429
$2,458 40,296 - - - - - - - - $2,458
40,296
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$5,842
Cost:
$3,612
- - - - $5,842 642 - - - - -
-
kWh
-
-
kW-months/year
$5,842
642
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$587
Cost:
$435
$257 4,205 $98 6 - - $112 - $120 - $257
4,205
kWh
$98
6
kW-months/year
-
-
MMBtu
$112
-
$
$120
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,145
Cost:
$25,536
$11,804 193,508 $4,341 265 - - - - - - $11,804
193,508
kWh
$4,341
265
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$179
Cost:
$548
$179 2,935 - - - - - - - - $179
2,935
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$37,131
Cost:
$31,860
$22,425 367,621 $8,632 527 $5,842 642 $112 - $120 - $22,425
367,621
kWh
$8,632
527
kW-months/year
$5,842
642
MMBtu
$112
-
$
$120
-
$
TOTAL IMPLEMENTED Savings:
$26,002
Cost:
$26,836
$18,172 297,907 $7,830 478 - - - - - - $18,172
297,907
kWh
$7,830
478
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes Administrative Changes