Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2009
Principal Product Extrusion Dies/Tooling
NAICS 333514 - Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 36,400
Annual Production 712 Units
Production Hrs. Annual 8,760
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $392,686 4,532,970 kWh $0.09
Electricity Demand $26,655 8,975 kW-months/year $2.97
Electricity Fees $13,071 - $ -
Natural Gas $40,291 3,350 MMBtu $12.03
TOTAL ENERGY COSTS $472,703
RECOMMENDED SAVINGS* $33,886 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,256
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$9,367
Cost:
-
$8,948 102,843 $419 141 - - - - - - $8,948
102,843
kWh
$419
141
kW-months/year
-
-
$
-
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,002
Cost:
-
$1,002 11,520 - - - - - - - - $1,002
11,520
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$673
Cost:
-
$631 7,249 $42 14 - - - - - - $631
7,249
kWh
$42
14
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$319
Cost:
-
$319 3,672 - - - - - - - - $319
3,672
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$10,115
Cost:
$1,032
$9,664 111,076 $451 152 - - - - - - $9,664
111,076
kWh
$451
152
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,498
Cost:
$748
$5,251 60,356 $247 83 - - - - - - $5,251
60,356
kWh
$247
83
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$204
Cost:
$305
$76 876 $3 1 - - $55 - $70 - $76
876
kWh
$3
1
kW-months/year
-
-
$
$55
-
$
$70
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,866
Cost:
$10,242
$4,649 53,436 $217 73 - - - - - - $4,649
53,436
kWh
$217
73
kW-months/year
-
-
$
-
-
$
-
-
$
09: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$225
Cost:
$478
$225 2,584 - - - - - - - - $225
2,584
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,617
Cost:
$7,912
- - - - $1,617 - - - - - -
-
kWh
-
-
kW-months/year
$1,617
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$33,886
Cost:
$20,717
$30,765 353,612 $1,379 464 $1,617 - $55 - $70 - $30,765
353,612
kWh
$1,379
464
kW-months/year
$1,617
-
$
$55
-
$
$70
-
$
TOTAL IMPLEMENTED Savings:
$21,256
Cost:
$11,295
$20,245 232,703 $886 298 - - $55 - $70 - $20,245
232,703
kWh
$886
298
kW-months/year
-
-
$
$55
-
$
$70
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Administrative Changes One-time Revenue or Avoided Cost