IAC logo
IAC Assessment: SU0286
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0286
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2009
Principal Product Electric Motors
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 75,000
Annual Production 200,000 Pieces
Production Hrs. Annual 2,250
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,840 991,872 kWh $0.10
Electricity Demand $61,379 3,686 kW-months/year $16.65
Electricity Fees $5,798 - $ -
Natural Gas $44,670 3,807 MMBtu $11.73
TOTAL ENERGY COSTS $242,687
RECOMMENDED SAVINGS* $37,572 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,051
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$11,756
Cost:
-
$5,828 55,500 $5,928 356 - - $5,828
55,500
kWh
$5,928
356
kW-months/year
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$8,876
Cost:
-
- - - - $8,876 - -
-
kWh
-
-
kW-months/year
$8,876
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$4,389
Cost:
-
$4,389 41,800 - - - - $4,389
41,800
kWh
-
-
kW-months/year
-
-
$
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$4,215
Cost:
-
$2,117 20,160 $2,098 126 - - $2,117
20,160
kWh
$2,098
126
kW-months/year
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,974
Cost:
-
- - - - $3,974 - -
-
kWh
-
-
kW-months/year
$3,974
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$1,462
Cost:
-
$1,196 11,388 $266 16 - - $1,196
11,388
kWh
$266
16
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,080
Cost:
$287
$1,181 11,250 $899 54 - - $1,181
11,250
kWh
$899
54
kW-months/year
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$400
Cost:
$457
$400 3,805 - - - - $400
3,805
kWh
-
-
kW-months/year
-
-
$
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$318
Cost:
$337
$138 1,314 $33 2 $147 - $138
1,314
kWh
$33
2
kW-months/year
$147
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$102
Cost:
$664
$102 972 - - - - $102
972
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$37,572
Cost:
$1,745
$15,351 146,189 $9,224 554 $12,997 - $15,351
146,189
kWh
$9,224
554
kW-months/year
$12,997
-
$
TOTAL IMPLEMENTED Savings:
$18,051
Cost:
$287
$9,126 86,910 $8,925 536 - - $9,126
86,910
kWh
$8,925
536
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost