Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2010 |
Principal Product | Insulators |
NAICS | 327110 - Pottery, Ceramics, and Plumbing Fixture Manufacturing |
SIC | 3264 - Porcelain Electrical Supplies |
Sales | $10,000,000-$50,000,000 |
# of Employees | 168 |
Plant Area (Sq.Ft.) | 486,662 |
Annual Production | 2,000,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $840,159 | 13,499,331 | kWh | $0.06 |
Electricity Demand | $293,468 | 29,158 | kW-months/year | $10.06 |
Electricity Fees | $19,016 | - | $ | - |
Natural Gas | $2,687,844 | 298,669 | MMBtu | $9.00 |
TOTAL ENERGY COSTS | $3,840,487 | |||
RECOMMENDED SAVINGS* | $155,520 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $7,601 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $22,577 Cost: - |
- | - | - | - | - | - | $22,577 | 2,218 |
- - kWh |
- - kW-months/year |
- - $ |
$22,577 2,218 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $4,309 Cost: $46 |
- | - | - | - | - | - | $4,309 | 423 |
- - kWh |
- - kW-months/year |
- - $ |
$4,309 423 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,292 Cost: $962 |
- | - | - | - | - | - | $3,292 | 323 |
- - kWh |
- - kW-months/year |
- - $ |
$3,292 323 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,754 Cost: $5,714 |
$5,754 | 84,622 | - | - | - | - | - | - |
$5,754 84,622 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $274 Cost: $560 |
$274 | 4,036 | - | - | - | - | - | - |
$274 4,036 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $35,377 Cost: $81,156 |
$26,379 | 387,920 | $8,998 | 894 | - | - | - | - |
$26,379 387,920 kWh |
$8,998 894 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $57,316 Cost: $175,000 |
$47,654 | 700,800 | $9,662 | 960 | - | - | - | - |
$47,654 700,800 kWh |
$9,662 960 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $12,124 Cost: $37,200 |
- | - | - | - | $12,124 | - | - | - |
- - kWh |
- - kW-months/year |
$12,124 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $7,849 Cost: $24,883 |
- | - | - | - | - | - | $7,849 | 771 |
- - kWh |
- - kW-months/year |
- - $ |
$7,849 771 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1211 MOVE BOILER TO MORE EFFICIENT LOCATION |
Savings: $6,648 Cost: $60,575 |
- | - | - | - | - | - | $6,648 | 653 |
- - kWh |
- - kW-months/year |
- - $ |
$6,648 653 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $155,520 Cost: $386,096 |
$80,061 | 1,177,378 | $18,660 | 1,854 | $12,124 | - | $44,675 | 4,388 | $80,061 1,177,378 kWh |
$18,660 1,854 kW-months/year |
$12,124 - $ |
$44,675 4,388 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $7,601 Cost: $1,008 |
- | - | - | - | - | - | $7,601 | 746 | - - kWh |
- - kW-months/year |
- - $ |
$7,601 746 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |