IAC logo
IAC Assessment: SU0305
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0305
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2011
Principal Product Manufacturing Converting Machinery
NAICS 333249 - Other Industrial Machinery Manufacturing
SIC 3559 - Special Industry Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 123,246
Annual Production 20 Units
Production Hrs. Annual 5,460
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $174,794 2,257,844 kWh $0.08
Electricity Demand $104,241 6,922 kW-months/year $15.06
Electricity Fees $7,040 - $ -
Natural Gas $146,994 16,585 MMBtu $8.86
TOTAL ENERGY COSTS $433,069
RECOMMENDED SAVINGS* $29,125 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,986
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$786
Cost:
$196
$786 10,920 - - - - - - $786
10,920
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$344
Cost:
$645
$344 4,780 - - - - - - $344
4,780
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$12,040
Cost:
$34,682
$(-924) (-12,830) - - - - $12,964 1,289 $(-924)
(-12,830)
kWh
-
-
kW-months/year
-
-
$
$12,964
1,289
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,313
Cost:
$16,531
- - - - $4,313 - - - -
-
kWh
-
-
kW-months/year
$4,313
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,642
Cost:
$60,207
$6,739 93,603 $4,903 322 - - - - $6,739
93,603
kWh
$4,903
322
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$29,125
Cost:
$112,261
$6,945 96,473 $4,903 322 $4,313 - $12,964 1,289 $6,945
96,473
kWh
$4,903
322
kW-months/year
$4,313
-
$
$12,964
1,289
MMBtu
TOTAL IMPLEMENTED Savings:
$11,986
Cost:
$60,852
$7,083 98,383 $4,903 322 - - - - $7,083
98,383
kWh
$4,903
322
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas