IAC logo
IAC Assessment: SU0307
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0307
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2011
Principal Product Recycled Commodities
NAICS 562920 - Materials Recovery Facilities
SIC 4953 - Refuse Systems
Sales $1,000,000-$5,000,000
# of Employees 41
Plant Area (Sq.Ft.) 68,000
Annual Production 40,000 Tons
Production Hrs. Annual 4,680
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $93,898 1,363,291 kWh $0.07
Electricity Demand $53,595 6,041 kW-months/year $8.87
Electricity Fees $11,409 - $ -
Natural Gas $55,571 3,330 MMBtu $16.69
TOTAL ENERGY COSTS $214,973
RECOMMENDED SAVINGS* $32,588 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,203
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,744
Cost:
-
$1,744 25,272 - - - - - - - - $1,744
25,272
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$2,054
Cost:
-
- - - - - - - - $2,054 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$2,054
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$323
Cost:
$97
$323 4,680 - - - - - - - - $323
4,680
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,550
Cost:
$920
$1,550 22,464 - - - - - - - - $1,550
22,464
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$16,557
Cost:
$21,257
- - - - - - $16,557 992 - - -
-
kWh
-
-
kW-months/year
-
-
$
$16,557
992
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,579
Cost:
$21,668
$7,202 104,364 $2,377 268 - - - - - - $7,202
104,364
kWh
$2,377
268
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$139
Cost:
$287
$139 2,021 - - - - - - - - $139
2,021
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$642
Cost:
$4,591
- - - - $642 - - - - - -
-
kWh
-
-
kW-months/year
$642
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$32,588
Cost:
$48,820
$10,958 158,801 $2,377 268 $642 - $16,557 992 $2,054 - $10,958
158,801
kWh
$2,377
268
kW-months/year
$642
-
$
$16,557
992
MMBtu
$2,054
-
$
TOTAL IMPLEMENTED Savings:
$28,203
Cost:
$43,022
$9,269 134,316 $2,377 268 - - $16,557 992 - - $9,269
134,316
kWh
$2,377
268
kW-months/year
-
-
$
$16,557
992
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost