IAC logo
IAC Assessment: SU0316
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0316
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Sealing Products
NAICS 339991 - Gasket, Packing, and Sealing Device Manufacturing
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 350,000
Annual Production 215,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $437,218 8,129,315 kWh $0.05
Electricity Demand $148,093 17,513 kW-months/year $8.46
Electricity Fees $14,034 - $ -
Natural Gas $186,260 28,769 MMBtu $6.47
TOTAL ENERGY COSTS $793,605
RECOMMENDED SAVINGS* $94,607 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,328
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$27,155
Cost:
$157
- - - - - - $27,155 4,197 - - -
-
kWh
-
-
kW-months/year
-
-
$
$27,155
4,197
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,173
Cost:
$328
$2,173 40,248 - - - - - - - - $2,173
40,248
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,167
Cost:
$3,286
$7,167 132,720 - - - - - - - - $7,167
132,720
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$710
Cost:
$570
$156 2,891 $34 4 - - - - $520 - $156
2,891
kWh
$34
4
kW-months/year
-
-
$
-
-
MMBtu
$520
-
$
05: 2.7314 REDUCE VENTILATION AIR Savings:
$3,824
Cost:
$4,193
$215 3,978 $173 20 - - $3,436 531 - - $215
3,978
kWh
$173
20
kW-months/year
-
-
$
$3,436
531
MMBtu
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,286
Cost:
$10,841
- - - - $4,286 - - - - - -
-
kWh
-
-
kW-months/year
$4,286
-
$
-
-
MMBtu
-
-
$
07: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$244
Cost:
$711
$244 4,525 - - - - - - - - $244
4,525
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$179
Cost:
$760
$94 1,747 $85 10 - - - - - - $94
1,747
kWh
$85
10
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$145
Cost:
$703
$111 2,059 $34 4 - - - - - - $111
2,059
kWh
$34
4
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$48,724
Cost:
$900,000
$54,588 1,010,880 $16,452 1,944 - - $(-22,316) (-3,449) - - $54,588
1,010,880
kWh
$16,452
1,944
kW-months/year
-
-
$
$(-22,316)
(-3,449)
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$94,607
Cost:
$921,549
$64,748 1,199,048 $16,778 1,982 $4,286 - $8,275 1,279 $520 - $64,748
1,199,048
kWh
$16,778
1,982
kW-months/year
$4,286
-
$
$8,275
1,279
MMBtu
$520
-
$
TOTAL IMPLEMENTED Savings:
$29,328
Cost:
$485
$2,173 40,248 - - - - $27,155 4,197 - - $2,173
40,248
kWh
-
-
kW-months/year
-
-
$
$27,155
4,197
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas One-time Revenue or Avoided Cost