Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Syracuse University |
---|---|
Assessment Year | 2012 |
Principal Product | Circuit Boards |
NAICS | 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing |
SIC | 3679 - Electronic Components, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 494 |
Plant Area (Sq.Ft.) | 255,000 |
Annual Production | 99,200 Pieces |
Production Hrs. Annual | 4,350 |
Location (State) | NY |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $274,504 | 4,392,785 | kWh | $0.06 |
Electricity Demand | $2,980 | 1,047 | kW-months/year | $2.85 |
Natural Gas | $36,898 | 667 | MMBtu | $55.32 |
TOTAL ENERGY COSTS | $320,108 | |||
RECOMMENDED SAVINGS* | $358,219 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $356,886 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.512 CONDENSE OPERATION INTO ONE BUILDING |
Savings: $333,000 Cost: $6,675 |
- | - | - | - | - | - | $333,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$333,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $1,105 Cost: $270 |
- | - | - | - | $1,105 | 102 | - | - |
- - kWh |
- - kW-months/year |
$1,105 102 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7314 REDUCE VENTILATION AIR |
Savings: $9,899 Cost: $14,092 |
$749 | 11,897 | $120 | 40 | $9,030 | 834 | - | - |
$749 11,897 kWh |
$120 40 kW-months/year |
$9,030 834 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,153 Cost: $2,179 |
$1,153 | 18,308 | - | - | - | - | - | - |
$1,153 18,308 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR |
Savings: $12,834 Cost: $27,300 |
$12,834 | 203,710 | - | - | - | - | - | - |
$12,834 203,710 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $228 Cost: $536 |
$228 | 3,618 | - | - | - | - | - | - |
$228 3,618 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $358,219 Cost: $51,052 |
$14,964 | 237,533 | $120 | 40 | $10,135 | 936 | $333,000 | - | $14,964 237,533 kWh |
$120 40 kW-months/year |
$10,135 936 MMBtu |
$333,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $356,886 Cost: $50,246 |
$14,736 | 233,915 | $120 | 40 | $9,030 | 834 | $333,000 | - | $14,736 233,915 kWh |
$120 40 kW-months/year |
$9,030 834 MMBtu |
$333,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |