IAC logo
IAC Assessment: SU0317
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0317
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Circuit Boards
NAICS 334418 - Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $100,000,000-$500,000,000
# of Employees 494
Plant Area (Sq.Ft.) 255,000
Annual Production 99,200 Pieces
Production Hrs. Annual 4,350
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $274,504 4,392,785 kWh $0.06
Electricity Demand $2,980 1,047 kW-months/year $2.85
Natural Gas $36,898 667 MMBtu $55.32
TOTAL ENERGY COSTS $320,108
RECOMMENDED SAVINGS* $358,219 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $356,886
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 4.512 CONDENSE OPERATION INTO ONE BUILDING Savings:
$333,000
Cost:
$6,675
- - - - - - $333,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$333,000
-
$
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,105
Cost:
$270
- - - - $1,105 102 - - -
-
kWh
-
-
kW-months/year
$1,105
102
MMBtu
-
-
$
03: 2.7314 REDUCE VENTILATION AIR Savings:
$9,899
Cost:
$14,092
$749 11,897 $120 40 $9,030 834 - - $749
11,897
kWh
$120
40
kW-months/year
$9,030
834
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,153
Cost:
$2,179
$1,153 18,308 - - - - - - $1,153
18,308
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$12,834
Cost:
$27,300
$12,834 203,710 - - - - - - $12,834
203,710
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$228
Cost:
$536
$228 3,618 - - - - - - $228
3,618
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$358,219
Cost:
$51,052
$14,964 237,533 $120 40 $10,135 936 $333,000 - $14,964
237,533
kWh
$120
40
kW-months/year
$10,135
936
MMBtu
$333,000
-
$
TOTAL IMPLEMENTED Savings:
$356,886
Cost:
$50,246
$14,736 233,915 $120 40 $9,030 834 $333,000 - $14,736
233,915
kWh
$120
40
kW-months/year
$9,030
834
MMBtu
$333,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes