IAC Assessment: SU0319
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0319
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Automotive Parts
NAICS 336350 - Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales >$500,000,000
# of Employees 615
Plant Area (Sq.Ft.) 270,000
Annual Production 2,000,000 Pieces
Production Hrs. Annual 6,920
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,886,521 33,834,464 kWh $0.06
Electricity Demand $83,493 107,042 kW-months/year $0.78
Electricity Fees $533,108 - $ -
Natural Gas $1,269,099 204,693 MMBtu $6.20
TOTAL ENERGY COSTS $3,882,221
RECOMMENDED SAVINGS* $314,742 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $279,154
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$167
Cost:
-
$163 2,906 $4 5 - - - - - - $163
2,906
kWh
$4
5
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$17
Cost:
-
$17 307 - - - - - - - - $17
307
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$13,648
Cost:
$1,000
$13,648 243,722 - - - - - - - - $13,648
243,722
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$24,117
Cost:
$15,840
$1,194 (-21,320) $309 (-396) - - $660 - $21,954 - $1,194
(-21,320)
kWh
$309
(-396)
kW-months/year
-
-
MMBtu
$660
-
$
$21,954
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,410
Cost:
$2,500
$3,410 60,896 - - - - - - - - $3,410
60,896
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,147
Cost:
$1,075
$527 9,408 $10 13 - - - - $610 - $527
9,408
kWh
$10
13
kW-months/year
-
-
MMBtu
-
-
$
$610
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$250,480
Cost:
$603,880
- - - - $250,480 40,400 - - - - -
-
kWh
-
-
kW-months/year
$250,480
40,400
MMBtu
-
-
$
-
-
$
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$503
Cost:
$1,805
$503 8,997 - - - - - - - - $503
8,997
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$21,253
Cost:
$79,288
- - - - - - - - $21,253 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$21,253
-
$
TOTAL RECOMMENDED Savings:
$314,742
Cost:
$705,388
$19,462 304,916 $323 (-378) $250,480 40,400 $660 - $43,817 - $19,462
304,916
kWh
$323
(-378)
kW-months/year
$250,480
40,400
MMBtu
$660
-
$
$43,817
-
$
TOTAL IMPLEMENTED Savings:
$279,154
Cost:
$623,295
$5,131 48,984 $319 (-383) $250,480 40,400 $660 - $22,564 - $5,131
48,984
kWh
$319
(-383)
kW-months/year
$250,480
40,400
MMBtu
$660
-
$
$22,564
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost