IAC logo
IAC Assessment: SU0322
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0322
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2012
Principal Product Video Borescopes
NAICS 334519 - Other Measuring and Controlling Device Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $100,000,000-$500,000,000
# of Employees 180
Plant Area (Sq.Ft.) 73,900
Annual Production 50,000 Pieces
Production Hrs. Annual 2,210
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,047 1,084,500 kWh $0.06
Electricity Demand $9,262 3,497 kW-months/year $2.65
Electricity Fees $8,178 - $ -
Natural Gas $16,673 1,951 MMBtu $8.55
TOTAL ENERGY COSTS $94,160
RECOMMENDED SAVINGS* $23,778 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,198
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$6,386
Cost:
-
$6,386 106,438 - - - - - - - - $6,386
106,438
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.7314 REDUCE VENTILATION AIR Savings:
$12,242
Cost:
$7,179
$623 10,387 $148 56 $11,471 1,130 - - - - $623
10,387
kWh
$148
56
kW-months/year
$11,471
1,130
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$876
Cost:
$528
$436 7,271 $26 10 - - $150 - $264 - $436
7,271
kWh
$26
10
kW-months/year
-
-
MMBtu
$150
-
$
$264
-
$
04: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$109
Cost:
$298
$109 1,809 - - - - - - - - $109
1,809
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$229
Cost:
$639
$229 3,805 - - - - - - - - $229
3,805
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$2,772
Cost:
$9,240
$1,656 27,605 $276 105 - - $480 - $360 - $1,656
27,605
kWh
$276
105
kW-months/year
-
-
MMBtu
$480
-
$
$360
-
$
07: 2.4321 UPGRADE OBSOLETE EQUIPMENT Savings:
$1,164
Cost:
$5,472
$1,098 18,308 $66 25 - - - - - - $1,098
18,308
kWh
$66
25
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,778
Cost:
$23,356
$10,537 175,623 $516 197 $11,471 1,130 $630 - $624 - $10,537
175,623
kWh
$516
197
kW-months/year
$11,471
1,130
MMBtu
$630
-
$
$624
-
$
TOTAL IMPLEMENTED Savings:
$11,198
Cost:
$15,240
$9,576 159,622 $368 140 - - $630 - $624 - $9,576
159,622
kWh
$368
140
kW-months/year
-
-
MMBtu
$630
-
$
$624
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost